Delivery Unit - Projects List

Financial Year Project NameWardLocationBudgetStatus
2018 / 2019Excavation of 13No Household water pansMukogodo WestIlpolei1,719,816.00Completed
2018 / 20191 Fish pond linerSalama100,000.00Ongoing
2018 / 20191 institutional fish pond linerIgwamiti100,000.00Ongoing
2018 / 20191 Silage chopper, 1 Baler and 1 grass cutterSalama124,000.00Ongoing
2018 / 20191 silage chopper, 1 baler, 1 grass cutterIgwamiti124,000.00Ongoing
2018 / 2019100 kgs of Pasture seeds and foddersSalama100,000.00Completed
2018 / 2019100kgs Pasture seeds and fodderIgwamiti100,000.00Ongoing
2018 / 201916000 fish fingerlingsIgwamiti160,000.00Ongoing
2018 / 201920,000 Fish fingerlingsSalama200,000.00Ongoing
2018 / 20192Bucks and 2RamsSalama140,000.00Ongoing
2018 / 2019Apiary equipment (An assortment)Salama43,200.00Ongoing
2018 / 2019Apiary equipment (assortment)Igwamiti43,200.00Ongoing
2018 / 2019Construction of Intake Structure for Munda Irrigation Scheme(Marmanet Ward)MarmanetMunda1,970,000.00Not commenced
2018 / 2019Design and construction of storage facilities and supply delivery installation and commissioning of maize dryers at Mutanga- EU IDEASMarmanetMutanga33,037,489.70Ongoing
2018 / 2019Design and construction of storage facilities and supply delivery installation and commissioning of maize dryers at Sipili - EU IDEASOlmoranSipili33,000,000.00Ongoing
2018 / 2019Design and construction of storage facilities, supply ,delivery,installation and commissioning of maize dryers - Kinamba EU IDEASGithigaKinamba33,687,079.00Ongoing
2018 / 2019Drilling of borehole at MuthengeraIgwamitiMuthengera1,720,000.00Ongoing
2018 / 2019Drip kit irrigation for Kiangoru Self Help GroupSalama2,060,153.00Completed
2018 / 2019Escavation of 13 Household WaterpansSalamaAcross the ward1,644,880.00Completed
2018 / 2019Escavation of 13 Household WaterpansMarmanetAcross the ward1,618,200.00Completed
2018 / 2019Escavation of 13 Household WaterpansUmandeAcross the ward2,000,000.00Ongoing
2018 / 2019Excavation of 13 Household WaterpansOlmoranAcross the ward1,698,704.00Ongoing
2018 / 2019Excavation of 13 Household WaterpansRumuruti Townshipmutamayu1,606,600.00Completed
2018 / 2019Excavation of 13 No Household water pansNanyukiAcross the ward1,571,800.00Completed
2018 / 2019Excavation of 13No Household water pansNgobitAcross the ward242,654.00Completed
2018 / 2019Excavation of 13No Water pansMukogodo EastNgarendare1,764,360.00Completed
2018 / 2019Excavation of 13No WaterpansSosianMaundu Meri1,786,400.00Ongoing
2018 / 2019Fruit tree nursery EquipmentIgwamiti42,500.00Completed
2018 / 2019High value fruit tree seedlingsIgwamiti65,000.00Completed
2018 / 2019High value fruit tree seedlingsSalama58,500.00Completed
2018 / 2019Household water panThingithuAcross the ward2,000,000.00Completed
2018 / 2019Installation of hatchery systems-RumurutiRumuruti TownshipRumuruti2,047,500.00Not commenced
2018 / 2019Livestock Weighing machines and strategic stockRumuruti Township733,000.00Ongoing
2018 / 2019Livestock Weighing machines and strategic stockMukogodo East733,333.00Not commenced
2018 / 2019Livestock Weighing machines and strategic stock at KimanjoMukogodo WestKimanjo733,333.00Not commenced
2018 / 2019Proposed excavation of 13 Household water pansTigithiAcross the ward717,883.00Completed
2018 / 2019Purchase Breeding StockMukogodo West2,632,424.00Not commenced
2018 / 2019Rehabilitation of Mbogoini irrigation damGithigaMbogoini3,886,000.00Not commenced
2018 / 2019Rehabilitation of Mutirithia Water panSegeraMutirithia1,952,280.00Ongoing
2018 / 2019Tree nursery equipmentSalama85,000.00Completed
2018 / 2019Additional floor to county officesRumuruti TownshipRumuruti44,897,926.00Ongoing
2018 / 2019Construction and equipping of fire station amenitiesIgwamitiNyahururu1,000,000.00Not commenced
2018 / 2019Construction and equipping of Nanyuki fire station amenitiesNanyukiNanyuki7,300,000.00Not commenced
2018 / 2019Construction of fire station at DoldolMukogodo East3,000,000.00Funds reallocated
2018 / 2019High mast flood lightsSegeraDebatas2,500,000.00Ongoing
2018 / 2019Carpentry and Joinery equipment at the VTCOlmoranOl moran406,450.00Ongoing
2018 / 2019Carpentry Equipment at VTCNgobitWiyumiririe203,225.00Ongoing
2018 / 2019Construction of Dining and Kitchen at Nanyuki VTCThingithuNanyuki5,120,808.00Completed
2018 / 2019Construction of ECDE centers at MagadiSosianMagadi1,375,637.00Ongoing
2018 / 2019Construction of ECDE centers at MathanjiSosianMathanji1,295,221.00Ongoing
2018 / 2019Construction of ECDE Class St LouisIgwamitiSt louis1,380,800.00Ongoing
2018 / 2019Construction of ECDE Class Uaso Narok Pry SchIgwamitiUaso narok1,111,885.00Ongoing
2018 / 2019Construction of ECDE Classroom at BahatiNgobitBahati1,378,080.00Ongoing
2018 / 2019Construction of ECDE Classroom at Kaaga PryRumuruti TownshipKaaga1,207,343.00Completed
2018 / 2019Construction of ECDE classroom at KirikoSalamaKiriko1,318,080.00Ongoing
2018 / 2019Construction of ECDE Classroom at LeleshwaOlmoranLeleshwa1,290,152.00Ongoing
2018 / 2019Construction of ECDE Classroom at Marura PryOlmoranMarura1,293,168.00Not commenced
2018 / 2019Construction of ECDE classroom at Matanya PriThingithuMatanya1,298,997.00Completed
2018 / 2019Construction of ECDE classroom at Muramati PriSegeraMuramati1,264,497.00Ongoing
2018 / 2019Construction of ECDE Classroom at MutamaiyoRumuruti TownshipMutamaiyo1,230,168.00Ongoing
2018 / 2019Construction of ECDE Classroom at MuthaigaNanyukiMuthaiga1,209,036.00Ongoing
2018 / 2019Construction of ECDE classroom at OlorukoMukogodo EastChumvi1,467,000.00Completed
2018 / 2019Construction of ECDE Classroom in KimanjuMukogodo WestKimanjo1,295,302.00Not commenced
2018 / 2019Construction of ECDE Classroom in MunishoiMukogodo WestMunishoi1,235,201.00Not commenced
2018 / 2019Construction of ECDE classroom Kihato PryTigithiKihato1,047,948.00Ongoing
2018 / 2019Construction of ECDE classroom Riachu PryTigithiRiachu1,340,883.00Completed
2018 / 2019Construction of electrical workshop in Nanyuki VTCThingithuNanyuki2,400,000.00Completed
2018 / 2019Construction of Gate and sentry at Nanyuki Social HallThingithuSocial hall667,701.00Completed
2018 / 2019Construction of Gatirima ECDE classroomMarmanetGatirima1,125,692.00Completed
2018 / 2019Construction of Kalalu ECDEUmandeKalalu1,300,041.00Ongoing
2018 / 2019Construction of Kisima ECDE classroomGithigaKisima1,142,882.00Completed
2018 / 2019Construction of metal work workshop in Nanyuki VTCThingithuNanyuki2,400,000.00Completed
2018 / 2019Construction of Nyariginu ECDEUmandeNyariginu1,378,080.00Ongoing
2018 / 2019Construction of one metal processing workshop at VTcNanyukiNanyuki2,295,060.00Ongoing
2018 / 2019Construction of Shemanai ECDE ClassroomIgwamitiShemanei1,111,885.00Ongoing
2018 / 2019Construction of workshop with service pit at Nanyuki VTCThingithuNanyuki6,394,685.00Completed
2018 / 2019Delivery of lockers and chairs at Arjiju SchoolMukogodo EastArjijo1,100,000.00Completed
2018 / 2019Dressmaking and Hairdressing Equipment at VTCTigithiTigithi256,867.00Ongoing
2018 / 2019Dressmaking equipmentMarmanetMarmanet643,766.00Ongoing
2018 / 2019Dressmaking equipment at Wiyumiririe VTCNgobitWiyumiririe321,958.00Ongoing
2018 / 2019Dressmaking equipment in VTCIgwamitiNyahururu321,883.00Ongoing
2018 / 2019Electrical equipment in VTCMarmanetMarmanet200,000.00Ongoing
2018 / 2019Electrical equipment VTCRumuruti TownshipRumuruti200,000.00Ongoing
2018 / 2019Electrical WorkshopNanyukiNanyuki VTC2,385,830.00Completed
2018 / 2019Food processing equipment at VTCTigithiTigithi616,397.00Ongoing
2018 / 2019Furnishing of Lairagwan ECDESegeraLairagwan462,500.00Completed
2018 / 2019Gate and Sentry at Social HallNanyukiSocial hall699,712.00Ongoing
2018 / 2019Gate and Sentry CEDCNanyukiCEDC662,650.00Ongoing
2018 / 2019Hairdressing equipment VTCRumuruti TownshipRumuruti256,867.00Ongoing
2018 / 2019Hairdressing, Carpentry and Masonry equipment in VTC'sMarmanetMarmanet406,450.00Ongoing
2018 / 2019Installation of hairdressing equipment at Wiyumiririe VTCNgobitWiyumiririe400,000.00Ongoing
2018 / 2019Lather machine G to GMarmanetMarmanet752,500.00Ongoing
2018 / 2019Leather Work Equipment at VTCIgwamitiNyahururu1,900,000.00Ongoing
2018 / 2019Masonry equipment at the VTCOlmoranOl moran0.00Ongoing
2018 / 2019Masonry Equipment at VTCNgobitWiyumiririe150,990.00Ongoing
2018 / 2019Motor vehicle equipmentMarmanetMarmanet430,000.00Ongoing
2018 / 2019Provision and installation of electrical equipment and furniture at Tigithi VTCTigithiTigithi500,000.00Ongoing
2018 / 2019Provision and installation of hairdressing equipment in Olmoran VTCOlmoranOl moran400,000.00Ongoing
2018 / 2019Renovation dormitory works at CEDCNanyukiCEDC860,952.00Ongoing
2018 / 2019Renovation works at Nanyuki StadiumNanyukiNanyuki stadium3,520,000.00Ongoing
2018 / 2019Renovation works at Nyahururu StadiumIgwamitiNyahururu988,900.00Ongoing
2018 / 2019Septic Tank 90,000 ltrs for CEDCNanyukiCEDC2,260,608.00Ongoing
2018 / 2019Sewer Line relocations at Social HallNanyukiSocial hall474,046.00Ongoing
2018 / 2019Subsidized Nanyuki Youth Vocational CentreThingithuNanyuki2,400,000.00Ongoing
2018 / 2019Supply, delivery, installation, testing and commisioning of 1 NMC Superturn Lathe Machine at Marmanet Youth PolytechnicMarmanetMarmanet526,750.00Ongoing
2018 / 2019Supply, delivery, installation, testing and commisioning of 1 NMC Superturn Lathe Machine at Nyahururu Youth PolytechnicIgwamitiNyahururu526,750.00Ongoing
2018 / 2019Workshop at Salama VTCSalamaSalama2,306,254.00Ongoing
2018 / 2019ADC gate-Dr. wachira Kiamariga SecSalama966,666.67Completed
2018 / 2019Construction of perimeter fence at Infrastructure CompoundNanyukiNanyuki CBD526,060.00Ongoing
2018 / 2019Contruction of Bridge-Shamanei KDSP FUNDEDIgwamitiShemanei20,000,000.00Completed
2018 / 2019Culvert across the wardOlmoran1,933,333.33Completed
2018 / 2019Culvert Installation - Gakuru - Matwiku roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Gataracha dam roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Gathuru - Milimani roadGithigaKinamba263,636.36Completed
2018 / 2019Culvert Installation - John Borri roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Kiamburi - Kisima roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Kiamburi roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Kipselem wa Kimani roadGithigaKinamba263,636.36Completed
2018 / 2019Culvert Installation - Kiwanja - Murichu roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Kwa Njiri roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Madam Nduta roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Mama Githiaka roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Mama Mbuki roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Mama Muchai roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Mama Tabitha roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Mugo Gachurai roadGithigaKinamba263,636.36Completed
2018 / 2019Culvert Installation - Munga roadGithigaKinamba263,636.36Completed
2018 / 2019Culvert Installation - Muturi - Njorua Pry roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Samaria - 3 Point roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Spiliano - Muraya roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation - Wa Kiriko roadGithigaMATWIKU263,636.36Completed
2018 / 2019Culvert Installation - Wa Makasi roadGithigaMithiga263,636.36Completed
2018 / 2019Culvert Installation works at Siek KipsingMukogodo West3,170,512.00Completed
2018 / 2019Culvert worksMukogodo West3.00Completed
2018 / 2019Culvert works - Bethel to tank road-600mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Chereta to gatami-1line 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Christoco road-1line 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Co-site estate roads(hygiene butchery corner)450mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Gatemu Njoguini- 1 line 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Kabia Chereta-1 line 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Kandie junction-Anapmoi road-600mmRumuruti Township725,000.00
2018 / 2019Culvert works - Kandie junction-Anapmoi road-900mmRumuruti Township725,000.00
2018 / 2019Culvert works - Kangumo Ngalachi-1 line 600mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Karaba naitoria 2 lines 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Karunga-Kanga(action school)road 600mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Kwa wanjiku njigari 2 lines 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - limunga Sec kwa Sophia 2lines 600mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Longomot Njoguini-1 line-900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Majani Ebeneza 2 lines 600mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Manguo Estate road-600mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Mbega Mairo saba-1 line 600mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Ndurumo dam culverts,Bolders to backfill culvertsRumuruti Township725,000.00
2018 / 2019Culvert works - Ndurumo dam cuverts-backfilling with gravel and compaction to culvertsRumuruti Township725,000.00
2018 / 2019Culvert works - Ndurumo dam road-backfilling to existing culvertsRumuruti Township725,000.00
2018 / 2019Culvert works - Ndurumo-Machunguru-Kagaa-Mwireri road-600mmRumuruti Township725,000.00
2018 / 2019Culvert works - Ndurumo-Machunguru-Kagaa-Mwireri road-900mmRumuruti Township725,000.00
2018 / 2019Culvert works - Njoguini to Soilo 1line 900mmMarmanet386,666.67Completed
2018 / 2019Culvert works - Rurii-Caanan-St.Luke(Losogwa)road 600mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Seberia,Ukweli and Maina Settlement road-600mmIgwamiti527,272.73Completed
2018 / 2019Culvert works - Shamanei to Kamkunji to Karangi pry-600mmIgwamiti527,272.73Completed
2018 / 2019Drainage rehabilitation of Sportsmans Arms - Muthaiga Primary School Rd RMLFNanyukiMuthaiga4,470,000.00Completed
2018 / 2019Grading and Culverts installation works Tuutuu to Mbogoini roadSegera1,617,040.00Completed
2018 / 2019Grading and Gravelling works - Matwiku Centre - Kamwenje roadGithigaMATWIKU263,636.36Completed
2018 / 2019Grading and Gravelling works Olmoran - Louniek junction(survey)section 1SosianSurvey5,800,000.00Ongoing
2018 / 2019Grading or Culvert Works - Bethel to tank roadIgwamiti527,272.73Completed
2018 / 2019Grading or Culvert Works - Shamanei to Kamkunji to Karangi pryIgwamiti527,272.73Completed
2018 / 2019Grading or Culvert Works - Siberia-CementaryIgwamiti527,272.73Completed
2018 / 2019Grading or Culvert Works - St. Benedict Hospital to Ngushanirio(VI)Igwamiti527,272.73Completed
2018 / 2019Grading works - AIPCA Thingithu beam BThingithu263,636.36Completed
2018 / 2019Grading works - Airforce fence road to join the existing murramThingithu263,636.36Completed
2018 / 2019Grading works - BreezeNanyuki252,173.91Completed
2018 / 2019Grading works - Catholic centre road-Nanyuki252,173.91Completed
2018 / 2019Grading works - Container roadThingithu263,636.36Completed
2018 / 2019Grading works - Eloto- Karaba roadMarmanet386,666.67Completed
2018 / 2019Grading works - Ever ready to Elimu roadNanyuki252,173.91Completed
2018 / 2019Grading works - Faith foundation roadNanyuki252,173.91Completed
2018 / 2019Grading works - Gatirima-Kamau roadMarmanet386,666.67Completed
2018 / 2019Grading works - Githehu to wainaina roadNanyuki252,173.91Completed
2018 / 2019Grading works - Gospel to Kimondo roadNanyuki252,173.91Completed
2018 / 2019Grading works - Ilipolei road to Rancher roadMukogodo West527,272.73Completed
2018 / 2019Grading works - Ilipolei to Ilipolie primaryMukogodo WestIlpolei527,272.73Completed
2018 / 2019Grading works - Ilipolei to soit otasheMukogodo West527,272.73Completed
2018 / 2019Grading works - JedidaNanyuki252,173.91Completed
2018 / 2019Grading works - Kalalu pryUmande207,142.86Completed
2018 / 2019Grading works - Kalalu Wakirigo to health-Kalalu girls Sec.Umande207,142.86Completed
2018 / 2019Grading works - Kamakai road to South imenti Sec, Bagdad road-behind Imenya dam, Wamura plot-Matunda roadNgobitSouth imenti966,666.67Completed
2018 / 2019Grading works - Karachi road to Sheik roadUmande207,142.86Completed
2018 / 2019Grading works - Karachi to Ngetha roadUmande207,142.86Completed
2018 / 2019Grading works - Karachi to Soloa to road 2000Umande207,142.86Completed
2018 / 2019Grading works - Karobia tokaramuki to baitireUmande207,142.86Completed
2018 / 2019Grading works - Katheri to PCEA Mwireri roadUmande207,142.86Completed
2018 / 2019Grading works - Kiambere-matopeni,kwa nganga-Ihigaini, Makutano-Shallom,Makutano-Rhino gate road, Village c roadNgobitNyambogichi966,666.67Completed
2018 / 2019Grading works - Kilimo - Airforce roadThingithu263,636.36Completed
2018 / 2019Grading works - Kimondo area road 1Nanyuki252,173.91Completed
2018 / 2019Grading works - Kirubis kieni-Mutaro Kanyua, Muhonyo pry-Wagachigua, PCEA karungu pry-Mutarakwa,Tropical-KaruchwaNgobitSirma966,666.67Completed
2018 / 2019Grading works - Kwa maitho roadThingithu263,636.36Completed
2018 / 2019Grading works - Kwa Mwaura Githuchi Dispensary roadUmande207,142.86Completed
2018 / 2019Grading works - Kwa ngarariga roadNanyuki252,173.91Completed
2018 / 2019Grading works - Kwa njoma roadNanyuki252,173.91Completed
2018 / 2019Grading works - Kwa wandeto-thiruMarmanet386,666.67Completed
2018 / 2019Grading works - Laikipia rehabilitation roadNanyuki252,173.91Completed
2018 / 2019Grading works - Likii river to Tranformer roadNanyuki252,173.91Completed
2018 / 2019Grading works - Lilia Mukindia roadNanyuki252,173.91Completed
2018 / 2019Grading works - Macece togathathi roadNanyuki252,173.91Completed
2018 / 2019Grading works - Majengo - Stadium roadThingithu263,636.36Completed
2018 / 2019Grading works - Maji -PCEAto Sheik roadUmande207,142.86Completed
2018 / 2019Grading works - Makutano-Matanya roadThingithu263,636.36Completed
2018 / 2019Grading works - Mararo to Weru roadUmande207,142.86Completed
2018 / 2019Grading works - Matanya- Burugutia roadThingithu263,636.36Completed
2018 / 2019Grading works - Matopeni-Kahinga,Rutunguru pry-ngochei.NgobitNgobit imenti966,666.67Completed
2018 / 2019Grading works - Methodists - AP roadThingithu263,636.36Completed
2018 / 2019Grading works - Migingo to Quarry roadUmande207,142.86Completed
2018 / 2019Grading works - Mirangini to Mama Maicah-saw mill roadThingithu263,636.36Completed
2018 / 2019Grading works - Mirera roadThingithu263,636.36Completed
2018 / 2019Grading works - Mugambi to Kabaye roadNanyuki252,173.91Completed
2018 / 2019Grading works - Mugumo to road 2000Umande207,142.86Completed
2018 / 2019Grading works - Mugweru to Mithamo roadUmande207,142.86Completed
2018 / 2019Grading works - Mukima ridge to lilia roadNanyuki252,173.91Completed
2018 / 2019Grading works - Munichoi road to nongorinito roadMukogodo West527,272.73Completed
2018 / 2019Grading works - Murungai road to road 2000Umande207,142.86Completed
2018 / 2019Grading works - Murungai to Mukuri roadUmande207,142.86Completed
2018 / 2019Grading works - Mwiato to Mwangi loopNanyuki252,173.91Completed
2018 / 2019Grading works - Ndemu to Ruai roadUmande207,142.86Completed
2018 / 2019Grading works - Ndirangu roadThingithu263,636.36Completed
2018 / 2019Grading works - Neno - AP roadThingithu263,636.36Completed
2018 / 2019Grading works - Ngando culvert to Nturukuma dispensary roadNanyuki252,173.91Completed
2018 / 2019Grading works - Ngenia Dispensary roadMukogodo EastNgenia725,000.00
2018 / 2019Grading works - Old tarmac road Kwa mama manjiUmande207,142.86Completed
2018 / 2019Grading works - Paramount to ACK roadNanyuki252,173.91Completed
2018 / 2019Grading works - Picha road to Manyatta roadMukogodo West527,272.73Completed
2018 / 2019Grading works - Polytechnic to Mutara road, Mugiko karadi, Caanan City to Sukurui river, Chief office to Gichijio, nyaranet-Mutara Nursery, Ma. Karuri roadNgobitWiyumiririe966,666.67Completed
2018 / 2019Grading works - Rancher road to Soit Oudo roadMukogodo West527,272.73Completed
2018 / 2019Grading works - Red cross - AIC ChurchThingithu263,636.36Completed
2018 / 2019Grading works - Rotasha to Gitumbi gateMukogodo EastChumvi725,000.00To continue from Gra
2018 / 2019Grading works - Ruai - Hali roadThingithu263,636.36Completed
2018 / 2019Grading works - Soit-Otashe to LambaaMukogodo WestIlpolei527,272.73Completed
2018 / 2019Grading works - St. Jude to Mukuri roadNanyuki252,173.91Completed
2018 / 2019Grading works - Tarmac to foot bridgeNanyuki252,173.91Completed
2018 / 2019Grading works - Teachers roadThingithu263,636.36Completed
2018 / 2019Grading works - Tetu Apostolic to gachcha roadUmande207,142.86Completed
2018 / 2019Grading works - tetu to Daiga SecUmande207,142.86Completed
2018 / 2019Grading works - Thingithu beam AThingithu263,636.36Completed
2018 / 2019Grading works - Trojan roadThingithu263,636.36Completed
2018 / 2019Grading works - Withare-Kahuruko-githira-kijabe, kona mbaya-kabauni-mwituria pry,Wamura-Sukurui riverNgobitMwituria966,666.67Completed
2018 / 2019Grading works - World vision road to mwireri roadUmande207,142.86Completed
2018 / 2019Grading works - World vision to Kongoni roadUmande207,142.86Completed
2018 / 2019Grading works for various roads across the wardOlmoran1,933,333.33Completed
2018 / 2019Grading works Kabanga PCEA-Mukuri pry-Wanguthiru ECDE roadTigithi1,450,000.00Completed
2018 / 2019Grading works Ndurumu-Machunguru-Kagaa-Mwereri roadRumuruti Township725,000.00
2018 / 2019Grading works Wanguthiru-Kiahuko-Jericho villageTigithi1,450,000.00Completed
2018 / 2019Grading, Gravelling and Culvert works at Nturukuma to Mukima VillageNanyukiNturukuma, Mukima3,904,994.00Ongoing
2018 / 2019Gravel excavation and haulage Gitumbi to Chumvi roadMukogodo EastChumvi725,000.00Completed
2018 / 2019Gravelling works - Karachi SheikUmande207,142.86Completed
2018 / 2019Gravelling works - Karobia karamuki BaitireUmande207,142.86Completed
2018 / 2019Gravelling works - Kwa Njoni road through green house to Nturukuma Dispensary road(1875cm)Nanyuki252,173.91Completed
2018 / 2019Gravelling works - Kwani Githuchi DispensaryUmande207,142.86Completed
2018 / 2019Gravelling works - Likii roads(1875cm)Nanyuki252,173.91Completed
2018 / 2019Gravelling works - Manjengo to Stadium road (1050cm)Thingithu263,636.36Completed
2018 / 2019Gravelling works - Mirangini to Mama Maicah-saw mill road (1200cm)Thingithu263,636.36Completed
2018 / 2019Gravelling works - Mugumo road 2000Umande207,142.86Completed
2018 / 2019Gravelling works - Murungai mukuriUmande207,142.86Completed
2018 / 2019Gravelling works - Murungai road2000Umande207,142.86Completed
2018 / 2019Gravelling works - Ngenia Dispensary road(1350cm)Mukogodo EastNgenia725,000.00Completed
2018 / 2019Gravelling works - Old tarmac road Kwa mama manjiUmande207,142.86Completed
2018 / 2019Gravelling works - Rotasha to Gitumbi gate(2250cm)Mukogodo EastChumvi725,000.00To continue from Gra
2018 / 2019Gravelling works - St.Loise PEFA (750cm)Thingithu263,636.36Completed
2018 / 2019Gravelling works - Trojan road(750cm)Thingithu263,636.36Completed
2018 / 2019Gravelling works Kabanga PCEA-Mukuri pry-Wanguthiru ECDE roadTigithi1,450,000.00Completed
2018 / 2019Gravelling works Tuutuu to Mbogoini roadSegera3,981,120.00Completed
2018 / 2019Gravelling works Wanguthiru-Kiahuko-Jericho villageTigithi1,450,000.00Completed
2018 / 2019Kiamariga-Karai roadSalama966,666.67Completed
2018 / 2019Kiamariga-Mutara roadSalama966,666.67Completed
2018 / 2019Lenana Road RMLFNanyukiNanyuki CBD25,184,760.00Completed
2018 / 2019Maintenance of Go Down Rd Section 2 improvement to bituminous standard - RMLFIgwamitiNyahururu10,832,952.00Completed
2018 / 2019Mbundalangi-Jowagi roadSalama966,666.67Completed
2018 / 2019Periodic Maintenance of Sharpe Rd RMLFIgwamitiNyahururu2,765,612.00Completed
2018 / 2019Periodic Maintenance of Go Down Road (Section 1)IgwamitiNyahururu6,319,175.0045% Complete
2018 / 2019Periodic Maintenance of KFA - Wakaba Road Phase 2 RMLFNanyukiNanyuki CBD6,384,640.00Completed
2018 / 2019Periodic Maintenance of Kimathi Road Phase 2 RMLFThingithuNanyuki CBD4,315,200.00Completed
2018 / 2019Periodic Maintenance of Munyua Road in Nyahururu RMLFIgwamitiNyahururu7,641,021.00Ongoing
2018 / 2019Periodic Maintenance of Ngare Narok Rd RMLFIgwamitiNyahururu7,688,611.00Completed
2018 / 2019Periodic Maintenance of Old Market RoadNanyukiNanyuki CBD4,047,657.00Completed
2018 / 2019Periodic Maintenance of Old Market Road RMLFThingithuNanyuki CBD5,030,502.00Completed
2018 / 2019Periodic Maintenance of Willy Jimmy Rd RMLFNanyukiNanyuki CBD5,529,720.00Completed
2018 / 2019Pesi Dispensary-Kwawakahiu-Kiriko-Kifuko ranch gate 2Salama966,666.67Completed
2018 / 2019Proposed Box Culvert at Doldol TownMukogodo West3,960,387.00Completed
2018 / 2019Proposed construction of Infrastructure Office in NanyukiNanyukiNanyuki CBD5,040,577.00Ongoing
2018 / 2019Proposed Culvert Installation in various xcrossing in Ngobit WardNgobitAcross the ward2,746,300.00Ongoing
2018 / 2019Proposed Grading, spot Improvement and Drainage works at shamanei Nyumba Tatu RoadIgwamitiShemanei2,128,600.00Completed
2018 / 2019Proposed Rehabilitation of Eroto Road Section 1 (Karaba - Chereta) RMLFMarmanetkaraba, chereta5,047,856.00Not commenced
2018 / 2019Proposed Rehabilitation of Paramount Chief - St. George Rd RMLFNanyuki5,598,160.00Completed
2018 / 2019Proposed Road opening, Grading and Gravelling of Likii Farm Road to Nturukuma villageNanyukiLikii, Nturukuma2,931,248.00Ongoing
2018 / 2019Proposed Road works at Doldol Junction through Doldol Mission Hospital to Doldol Centre in M.EastMukogodo West3,979,961.00Completed
2018 / 2019Raya-Subego roadSalama966,666.67Completed
2018 / 2019Road network improvement: sipili cereal-njaramba road, sipili catholic-naiborom primary road, wangwachikimori-nyakinywa road,ndaragwiti-ndoria-hannigton road,mr. muriu-machaa-idp-mbogoini road,olmoran-laikipia ranch road, makutano and nyakinyuaOlmoran1,933,333.33Completed
2018 / 2019Road opening and grading works - Losheki to main UwasoMukogodo West527,272.73Completed
2018 / 2019Road opening and grading works - Main Uaso to TuralolMukogodo West527,272.73Completed
2018 / 2019Road opening and grading works - Salamba to Wakumbe to Seki roadMukogodo West527,272.73Completed
2018 / 2019Road opening and grading works - Tura to Ngabolo to NgiroritiMukogodo West527,272.73Completed
2018 / 2019Routine Maintenance and Completion of Pub to Mwiyogo Bridge towards Thome Road RMLFTigithi4,460,000.00Completed
2018 / 2019Routine Maintenance of Destiny Academy - Kieni AP Post Road RMLFGithigaKieni4,843,812.00Completed
2018 / 2019Routine Maintenance of Lariak Day- Kaharati Primary - Naiborom PrimaryOlmoran4,510,428.00Completed
2018 / 2019Routine Maintenance of Mathenge Mirugi Phase 2 RMLFNanyukiNanyuki CBD4,700,000.00Completed
2018 / 2019Routine Maintenance of Ngombe Moja - Aiyam Road in Rumuruti RMLFRumuruti TownshipNgombe moja, aiyam4,464,000.00Completed
2018 / 2019Routine Maintenance of Samburu - Lentile -Chieni Road RMLFNanyukiNanyuki CBD10,501,480.00Completed
2018 / 2019Smart Town Initiative - Wiyumiririe KDSP FUNDEDNgobitWiyumiririe50,000,000.00Ongoing
2018 / 2019Spreading, watering and compaction - Gitumbi to Chumvi roadMukogodo EastChumvi725,000.00Completed
2018 / 2019Spreading, watering and compaction - Proposed Box Culvert at Doldol TownMukogodo EastDoldol725,000.00Completed
2018 / 2019Spreading, watering and compaction - Proposed Road works at Doldol Junction through Doldol Mission Hospital to Doldol Centre in M.EastMukogodo East725,000.00Completed
2018 / 2019Supply of precast items for wiyumiririe marketNgobitWiyumiririe23,546,180.00Ongoing
2018 / 2019Upgrade of roads in Rumuruti - KuSPRumuruti TownshipRumuruti50,000,000.00Ongoing
2018 / 2019Likii VCT to Safari Lodge to Likii Special School KDSPNanyukiLikii3,800,000.00Not commenced
2018 / 2019St. Paul to Baraka KDSP FUNDEDThingithuBaraka3,800,000.00Not commenced
2018 / 2019St.Loise PEFA KDSP FUNDEDThingithuRuai3,500,000.00Not commenced
2018 / 2019120 bed maternity block at Nyahururu hospitalIgwamitiNyahururu50,000,000.0060% done
2018 / 20193 door pit latrine at Kalalu DispensaryUmandekalalu651,000.00Ongoing
2018 / 20193 door pit latrine at Timau Farmers DispensaryUmandekalalu646,016.00Ongoing
2018 / 2019Cabro Paving at Nyahururu HospitalIgwamitiNyahururu7,527,442.00Completed
2018 / 2019Completion work at Solio Health CentreTigithiSolio0.00Completed
2018 / 2019Construction of 3 door pit latrine at Marura DispensarySegeraMarura0.00Evaluation Stage
2018 / 2019Construction of 3 door pit latrine to Chumvi DispensaryMukogodo EastChumvi1,266,666.67Evaluation Stage
2018 / 2019Construction of 3 door pit latrine to Maundu Meri DispensarySosianMaundu Meri640,720.00Not Complete
2018 / 2019Construction of 3 door pit latrine to Naiperere DispensaryMukogodo WestNaiperere799,000.00Ongoing
2018 / 2019Construction of 3 door pit latrine to Seria DispensaryMarmanetSeria0.00Evaluation stage
2018 / 2019Construction of Bahati DispensaryTigithiBahati3,148,721.00Ongoing
2018 / 2019Construction of Dispensary at SeriaMarmanetSeria4,261,096.00Completed
2018 / 2019Construction of Kariguini DispensaryNgobitKariguini4,690,004.00Completed
2018 / 2019Construction of Karumaindo dispensaryGithigaKarumaindo1,767,261.00Ongoing
2018 / 2019Construction of Maili Saba DispensaryIgwamitiMaili saba4,851,038.00Completed
2018 / 2019Construction of Male ward to Doldol HospitalMukogodo EastDoldol town1,266,666.67Evaluation Stage
2018 / 2019Construction of maternity block at Baraka DispensaryThingithuBaraka3,601,121.00Not commenced
2018 / 2019Construction of maternity block at Depatas Health CentreSegeraDebatas3,987,150.00Not commenced
2018 / 2019Construction of maternity block at Melwa health centerMarmanetMelwa3,981,595.00Not commenced
2018 / 2019Construction of maternity block at Mugumo DispensaryUmandeMugumo3,500,166.00Not commenced
2018 / 2019Construction of maternity block at Nanyuki teaching and referral hospitalNanyukiNanyuki50,000,000.00Ongoing
2018 / 2019Construction of OPD Block to Lekiji DispensarySegeraLekiji5,575,157.00Not Complete
2018 / 2019Construction of Rabal DispensarySosianRabal2,542,058.00Completed
2018 / 2019Costruction of an X-ray block KDSP FUNDEDRumuruti TownshipRumuruti3,796,709.00Ongoing
2018 / 2019Dispensary constructionMukogodo WestMusul2,000,000.00Not commenced
2018 / 2019Drilling Mugumo Dispensary Borehole KDSPUmandeMugumo2,690,968.00Not commenced
2018 / 2019Drilling of Matanya Dispensary BoreholeTigithiMatanya2,607,588.00Ongoing
2018 / 2019Equipping of Marura BoreholeSegeraMarura2,679,000.00Not Complete
2018 / 2019Extension of outpatient block to Nanyuki Teaching and Referral HospitalNanyukiNanyuki3,882,346.00Completed
2018 / 2019Fencing Ndemu Dispensary KDSPUmandeNdemu2,900,000.00Not commenced
2018 / 2019Fencing of Ethi DispensaryMukogodo EastEthi1,788,247.00Completed
2018 / 2019Grading and gravelling works to Doldol Hospital KDSPMukogodo EastDoldol town2,700,000.00Evaluation Stage
2018 / 2019Marura Borehole KDSPThingithuMarura2,400,000.00Not commenced
2018 / 2019Proposed Culvert installation works at Doldol Hospital road KDSPMukogodo EastDoldol town1,266,666.67Evaluation Stage
2018 / 2019Rehabilitation of Suguroi DamRumuruti TownshipSuguroi0.00Evaluation stage
2018 / 2019Renovations to Ol jabet dispensaryMarmanetOl jabet3,498,450.00Completed
2018 / 2019Renovations to Salama DispensarySalamaSalama1,397,104.00Not commenced
2018 / 2019Suply and delivery of examination couchNanyukiNanyuki5,126,700.00Completed
2018 / 2019X-ray Block Kimanjo health centreMukogodo WestKimanjo5,000,000.00Not commenced
2018 / 2019Ablution block at AnnexNanyukiAnnexx1,276,063.00Completed
2018 / 2019Ablution blocks at Ilpolei MarketMukogodo WestIlpolei1,211,040.00Not commenced
2018 / 2019Boda boda shade at Irura StageThingithuIrura Stage246,023.00Completed
2018 / 2019Boda boda shade at NanyukiNanyukiMajengo246,023.00Completed
2018 / 2019Boda boda shed at BarakaThingithuBaraka364,477.00Completed
2018 / 2019Boda boda shed at Kwa MwauraUmandeKwa Mwaura357,338.00Ongoing
2018 / 2019Boda boda shed at MajengoThingithuMajengo226,200.00Completed
2018 / 2019Boda boda shed at MireraThingithuMirera226,200.00Completed
2018 / 2019Boda boda shed at RuaiThingithuRuai226,200.00Completed
2018 / 2019Boda boda shed at ThingithuThingithuThingithu319,774.00Completed
2018 / 2019Bodaboda shade at Maili sabaMarmanetMaili Saba225,098.00Completed
2018 / 2019Bodaboda shed at KianjomoUmandeKianjomo226,200.00Ongoing
2018 / 2019Bodaboda shed at Mahiga MeruUmandeMahiga Meru226,200.00Ongoing
2018 / 2019Bodaboda shed at Maili NaneUmandeMaili Nane383,913.00Not commenced
2018 / 2019Bodaboda shed at MathangiroUmandeMathangiro346,318.00Incomplete
2018 / 2019Bookshelves Renovations In Trade Cooperatives in Nanyuki RegistyNanyukiNanyuki749,727.00Completed
2018 / 2019Car ParkNanyukiNanyuki411,629.00Completed
2018 / 2019Civil Works and additional staircase works at Nanyuki Bus ParkNanyukiNanyuki1,600,743.00Completed
2018 / 2019Construction of ablution block at Nyahururu open air marketIgwamitiNyahururu1,064,880.00Not commenced
2018 / 2019Construction of ablution block at EndanaSegeraEndana1,200,000.00
2018 / 2019Construction of ablution block at KianjomoUmandeKianjomo1,200,000.00Ongoing
2018 / 2019Construction of ablution block at MagadiSosianMagadi1,062,569.00Not commenced
2018 / 2019Construction of ablution block at Mugumo, Umande wardUmandeMugumo Centre1,158,675.00Completed
2018 / 2019Construction of ablution block at NgeniaMukogodo EastNgenia1,154,052.00Completed
2018 / 2019Construction of ablution block at RumurutiRumuruti TownshipRumuruti Town1,200,000.00Not commenced
2018 / 2019Construction of ablution block at SirmaNgobitSirma Centre1,200,000.00Completed
2018 / 2019Construction of ablution blocks at lamuriaTigithiLamuria1,041,645.00Completed
2018 / 2019Drilling of borehole and fencing works at Endana MarketSegeraEndana Market3,000,000.00Ongoing
2018 / 2019Erection of signage at manguo hippo point, IgwamitiIgwamitiManguo & T.Falls348,000.00Completed
2018 / 2019Extension of Jua Kali shedIgwamitiNyahururu1,679,506.00Completed
2018 / 2019Fencing of Solio community game conservancyTigithiSolio 6&7 villages3,445,200.00Complete Phase1
2018 / 2019Gravelling of Kalalu market, marketUmandeKalalu1,000,000.00Ongoing
2018 / 2019Market shed at RumurutiRumuruti TownshipRumuruti Town2,736,931.50Complete Phase 1
2018 / 2019Modern market shade at Rumuruti marketRumuruti TownshipRumuruti Town3,344,754.00Completed
2018 / 2019Mounting of access to footpath at Thompson FallsIgwamitiT.Falls2,151,850.00Completed
2018 / 2019Nanyuki stage kiosk phase ll constructionNanyukiNanyuki16,924,400.00Ongoing
2018 / 2019Pit latrine at GatundiaMarmanetGatundia1,112,148.00Ongoing
2018 / 2019Pit Latrine at Il MotiokMukogodo WestIlmotiok1,261,534.00Completed
2018 / 2019Pit latrine at KarabaMarmanetKaraba1,142,718.00Not commenced
2018 / 2019Pit Latrine at MatwikuGithigaMatwiku904,116.30Not commenced
2018 / 2019Pit latrine at ThomeSalamaThome Centre1,053,928.00Completed
2018 / 2019Proposed Ablution Block at Annex Trade OfficesThingithuAnnex393,840.00Completed
2018 / 2019Proposed boda boda shed at GatirimaMarmanetGatirima226,200.00Completed
2018 / 2019Proposed boda boda shed at LimungaMarmanetLimunga186,967.00Not commenced
2018 / 2019Proposed boda boda shed at MuruaiSalamaMuruai226,200.00Not commenced
2018 / 2019Proposed boda boda shed in MurukuSalamaMuruku Centre230,777.00Completed
2018 / 2019Proposed Bodaboda shed at Irura StageNanyukiNanyuki300,661.00Completed
2018 / 2019Proposed bodaboda shed Kwa WandetoMarmanetKwa Wandeto226,201.00Completed
2018 / 2019Proposed Chainlink Fence for Livestock Market at Dol DolMukogodo EastDoldol town2,895,360.00Not commenced
2018 / 2019Proposed construction of modern Shed at Nyahururu open air marketIgwamitiNyahururu3,572,800.00Ongoing
2018 / 2019Proposed Gravelling works at Nanyuki Old Open Air MarketNanyukiOld Market679,342.00Completed
2018 / 2019Proposed Landscape to Kanu Grounds Phase2NanyukiNanyuki2,857,196.00Completed
2018 / 2019Proposed painting and civil works at Nyahururu Jua Kali ShedsIgwamitiNyahururu1,581,207.00No Status
2018 / 2019Proposed Pit latrine at KarugaIgwamitiKaruga1,384,054.00Not Complete
2018 / 2019Proposed pit latrine at PesiSalamaPesi Centre1,211,040.00Ongoing
2018 / 2019Proposed renovation of Nyahururu market stalls Phase 2IgwamitiNyahururu1,521,220.00Completed
2018 / 2019Proposed Supply and Delivery, Installation, Testing and Commissioning of Electrical Works for Nanyuki Open Air MarketThingithuThingithu811,280.00No Status
2018 / 2019Proposed toilet at Gandutura trading centerSosianKandutura1,200,000.00Not commenced
2018 / 2019Proposed toilet at Ol-arinyiro trading centerRumuruti TownshipOl arinyiro1,200,000.00Not commenced
2018 / 2019Proposed Twala cultural centre at Laikipia North sub-countyMukogodo WestIlpolei1,763,200.00Ongoing
2018 / 2019Rehabilitation at Manguo Hippo PointIgwamitiManguo7,000,000.00Not commenced
2018 / 2019Rehabilitation of a toilet and murraming works at Nyahururu Jua Kali ShedIgwamitiNyahururu2,000,000.00Ongoing
2018 / 2019Rehabilitation of Naatum cultural ManyattaMukogodo WestMurupusi1,750,440.00Ongoing
2018 / 2019Rehabilitation of open air market drainageThingithuThingithu3,225,524.00Completed
2018 / 2019Rehabilitation of Rumuruti Jua Kali ShedRumuruti TownshipRumuruti Town2,739,920.00Completed
2018 / 2019Rehabilitation of Ukumbusho open air market drainageNanyukiNanyuki3,225,524.00Completed
2018 / 2019Rehabilitation of Wiyumiririe Market ShedNgobitWiyumiririe Centre2,900,000.00Ongoing
2018 / 2019Renovations at Olgaboli community centreMukogodo WestNgabolo538,240.00Ongoing
2018 / 2019Stairway at Nanyuki Bus Park Stalls in NanyukiNanyukiNanyuki1,393,448.00Completed
2018 / 2019Steel gates and other works in Nanyuki open air marketThingithuThingithu2,528,916.00Completed
2018 / 2019Cattle trough and water kiosk in Kiwanja Ndege borehole KDSPMukogodo EastKiwanja Ndege2,000,000.00Not commenced
2018 / 2019Chainlink Fencing and office block to Siberia CemeteryIgwamiti2,863,917.00Completed
2018 / 2019Compaction of Nyahururu dumpsiteIgwamitiRwathia500,000.00Completed
2018 / 2019Construction of Depatas water projectSegeraDebatas6,570,528.00Completed
2018 / 2019Construction of masonry storage tank at Kieni Nganoini water projectSalamaNganoini2,600,000.00Awaiting site handov
2018 / 2019Construction of Munyaka Water KioskSalamaMunyaka720,507.00Completed
2018 / 2019Construction of Ruai Masonry TankThingithuRuai568,180.00Completed
2018 / 2019Desilting of Wangwaci dam under Drought mitigationOlmoranWangwaci500,000.00Completed
2018 / 2019Doldol dam rehabilitationMukogodo EastDoldol town5,535,367.00Completed
2018 / 2019Drilling and equipping of Baraka borehole.ThingithuBaraka2,529,491.00Completed
2018 / 2019Drilling and equipping of Emgwen secondary school boreholeRumuruti TownshipEmgwen2,116,246.00Completed
2018 / 2019Drilling and equipping of Muramati Secondary BoreholeUmandeMuramati3,344,095.00Completed
2018 / 2019Drilling of borehole at MuthengeraIgwamitiMuthengera2,680,000.00Completed
2018 / 2019Drilling of Kurum boreholeMukogodo WestKurum2,800,000.00Completed
2018 / 2019Drilling of Machunguru boreholeRumuruti TownshipMachunguru2,750,000.00Not commenced
2018 / 2019Drilling of Milimani BoreholeGithigaMilimani2,499,840.00Completed
2018 / 2019Drilling of Mwenje BoreholeGithigaMwenje2,800,500.00Completed
2018 / 2019Drilling of Mwiyogo boreholeTigithiMwiyogo2,200,000.00Completed
2018 / 2019Equiping of Githanji BoreholeSosianGithanji3,442,000.00Completed
2018 / 2019Equipping of Gathanji Primary School BoreholeRumuruti TownshipGathanji3,442,996.00Completed
2018 / 2019Equipping of Marura borehole KDSPSegeraMarura2,400,000.00Evaluation Stage
2018 / 2019Equipping of Milimani BoreholeGithigaMilimani3,534,561.00Completed
2018 / 2019Equipping of Muramati secondary school boreholeSegeraMuramati3,995,000.00Completed
2018 / 2019Equipping of Muthengera boreholeIgwamitiMuthengera3,580,000.00Completed
2018 / 2019Equipping of Mwenje BoreholeGithigaMwenje3,560,000.00Ongoing
2018 / 2019Equipping of Mwireri BoreholeUmandeMwireri2,027,159.00Ongoing
2018 / 2019Equipping of Ndemu Secondary boreholeUmandeNdemu2,691,120.00Completed
2018 / 2019Equipping of Shalom BoreholeNgobitShalom3,662,264.00Completed
2018 / 2019Equipping of Shalom IDP BoreholeSalamaShalom3,988,196.00Completed
2018 / 2019Equipping of Suguroi BoreholeNgobitSuguroi3,635,634.00Completed
2018 / 2019Fencing of Nanyuki CemeteryNanyuki2,200,000.00Ongoing
2018 / 2019Flushing of Doldol 2 (Kibaki) boreholeMukogodo EastDoldol town939,982.80Completed
2018 / 2019Mbombo dam rehabilitationSosian3,540,953.00Completed
2018 / 2019Motorizing Nturukuma boreholeNanyukiNturukuma3,269,278.00Completed
2018 / 2019Murraming and Compaction at Nanyuki dumpsiteNanyuki739,750.00Completed
2018 / 2019Overhauling of Generator set of Ol Moran earth damOlmoranOlmoran361.00Completed
2018 / 2019Rainwater harvesting interventions in schools-Mategithi pryRumuruti TownshipMategethi300,000.00Ongoing
2018 / 2019Rainwater harvesting interventions in schools-Mutaro pryOlmoranMutaro300,000.00Completed
2018 / 2019RDU Rumuruti pipeline from Ngaremare boreholeRumuruti TownshipNgaremare324,000.00Completed
2018 / 2019Rehabilitation and expansion of the intake works at GatamiMarmanetGatami2,358,523.00Completed
2018 / 2019Rehabilitation of Kariunga damSegeraKariunga9,964,322.00Completed
2018 / 2019Rehabilitation of Mbombo DamRumuruti Township3,268,358.00Completed
2018 / 2019Rehabilitation of Naibor Community BoreholeSegeraNaibor539,400.00Completed
2018 / 2019Rehabilitation of ngobit damNgobitNgobit7,166,684.00Not commenced
2018 / 2019Rehabilitation of Nyahururu dumpsiteIgwamitiRwathia423,750.00Completed
2018 / 2019Rehabilitation of Tiamamut damMukogodo WestTiamamut5,957,460.00Completed
2018 / 2019Rehabilitation, equipping and motorizing/electrification of lounyek boreholesSosianLounyek3,272,840.00Completed
2018 / 2019Repair and service of Gloise Borehole engineRumuruti TownshipGloise534,091.00Completed
2018 / 2019Repair and Servicing of NgaremareMukogodo WestNgaremare429,374.00Completed
2018 / 2019Repair and servicing of Ol Moran town BoreholeOlmoranOl moran454,750.00Completed
2018 / 2019Repair and Servicing of Tandare BoreholeGithigaTandare577,680.00Completed
2018 / 2019Repair and servicing of Uaso BoreholeMukogodo WestUaso249,400.00Completed
2018 / 2019Repair of Doldol 1 (water office) boreholeMukogodo EastDoldol town400,000.00Completed
2018 / 2019Repair of four boreholes(Gensets) in Laikipia North - Naiperere, Il Polei , LoborsoitMukogodo WestNaiperere, Il Polei , Loborsoit200,000.00Completed
2018 / 2019Repair of Riachu boreholeTigithiRiachu550,000.00Completed
2018 / 2019Repair of Suguroi BoreholeNgobitSuguroi200,000.00Completed
2018 / 2019Repair of Wangwachi and Kahuruko BoreholeOlmoranKahuruko & Wangwachi3,534,561.00Completed
2018 / 2019Rrepair and Servicing of Gloise Borehole engineSosianGloise581,624.00Completed
2018 / 2019Solar epuipping of Doldol 2(Kibaki) boreholeMukogodo EastDoldol town0.00Completed
2018 / 2019Solar epuipping of Doldol 3(Loisukut) boreholeMukogodo EastLoisukut0.00Completed
2018 / 2019Solar Equipping of Emgwen boreholeRumuruti TownshipEmgwen3,001,254.00Completed
2018 / 2019Solar Equipping of Kagaa boreholeRumuruti TownshipKaaga3,000,000.00Completed
2018 / 2019Solar Equipping of Mahianyu boreholeIgwamitiMahianyu1,650,000.00Ongoing
2018 / 2019Solio settlement scheme water project WSTF/CGLTigithiSolio140,000,000.00Ongoing
2018 / 2019Supply and delivery of hardware materials to Doldol Water ProjectMukogodo EastDoldol town895,580.00Completed
2018 / 2019Supply and delivery of Ngorare Fence materialsSalamaNgorare2,750,374.00Completed
2018 / 2019Supply and Delivery of Pipes and Fittings to Chumvi Water ProjectUmandeChumvi2,406,649.00Completed
2018 / 2019Supply and Delivery of pipes at Kiriti water projectMarmanetKiriti2,495,878.00Ongoing
2018 / 2019Supply and delivery of skip binsNanyukiNanyuki3,401,000.00Completed
2018 / 2019Supply and Delivery of Tree seedlingSosian299,947.00Completed
2018 / 2019Supply and Delivery of tree seedlingsGithigaGithiga347,160.00Completed
2018 / 2019Supply and Delivery of tree seedlings in SalamaSalamaSalama299,947.00Completed
2018 / 2019Supply and Dellivery of Water Connection Hardware to Doldol Water ProjectMukogodo WestDoldol944,430.00Completed
2018 / 2019Supply and installation of green houses for opuntia cactus managementMukogodo West1,900,000.00Ongoing
2018 / 2019Supply and installation of green houses for opuntia cactus management in Mukogodo East and Mukogodo WestMukogodo East1,900,000.00
2018 / 2019Supply of Chumvi Water Project pipes and fittings for extension (Osirwa)Mukogodo EastChumvi2,406,430.00Completed
2018 / 2019Supply of Limunga pipes and Kiriti FittingsMarmanetLimunga/kirirti324,000.00Ongoing
2018 / 2019Supply of pipes and fittings for Nganoini water projectSalamaNganoini3,925,480.00Awaiting site handov
2018 / 2019Supply of pipes for Canaan water projectRumuruti TownshipCanaan520,000.00Ongoing
2018 / 2019Supply of seedlingsMukogodo West347,803.75Completed
2018 / 2019Supply of Skip Bins to IgwamitiIgwamitiNyahururu3,401,000.00Ten Bins Supplied
2018 / 2019Supply of tree seedlingsNanyuki347,248.00Completed
2018 / 2019Supply of water fittings to Mwiremia Water ProjectTigithiMwiremia519,921.70Completed
2018 / 2019Supply, delivery and installation of pipes Pesi water projectSalamaPesi1,499,996.00Completed
2018 / 2019Water harvesting for Tangi NyeusiSegeraTangi nyeusi367,686.00Completed

 

  • Sub-Counties
  • Wards
  • Clean And Accessible Water
  • Education Initiatives
  • Outcome of Tenders
  • Public Service Reforms
  • Smart Town Initiative
  • Statistical Abstracts
  • Universal Health Coverage (UHC)
  • Amaya Triangle Initiative
  • Jobs / Vacancies
  • Sitemap
  • Track Request
  • Contacts
  • Staff Mail
  • WHATS NEW