| 1 |
Provision Of Soil Analysis Services-300 samples |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 2 |
Renovation of Nyahururu Slaughter house |
5,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 3 |
Routine maintenance of cluster ii roads in nyahururu town |
4,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 4 |
Routine maintenance of cluster 1 roads in nyahururu town |
4,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 5 |
Kigumo multipurpose water project |
8,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 6 |
Improvement of thiga – macira road opening grading, gravelling and drainage |
4,982,126 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 7 |
Being Payment For Compaction Of Nyahururu Dumpsite |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 8 |
Improvement of oljabet hospital – pcea chemichemi road grading, gravelling and drainage |
2,648,167 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 9 |
Compaction Of Nyahururu Dumpsite |
1,498,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 10 |
Improvement of juakali sagak road grading and gravelling |
1,679,494 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 11 |
Supply And Delivery Of Pipes For Krudger Water Project |
1,019,900 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 12 |
Improvement of karuga nanok junction- action praise road grading, gravelling and drainage |
4,560,424 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 13 |
Construction of market shades - Nyahururu |
2,055,926 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 14 |
Thomson gate and general repairs |
1,027,968 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 15 |
supply and delivery of borehole consumables (Table land) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 16 |
Repair and maintenance of markets- Cereal Market |
998,656 |
Ongoing |
Not Provided |
Not Provided |
53 |
22 |
| 17 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 18 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 19 |
Extension and modernization of OPD at NCRH |
2,780,789 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 20 |
Extension of Cabro Pavement at NCRH |
4,397,038 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 21 |
Construction of Modern ablution block in outpatient area at NCRH |
4,798,000 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 22 |
Construction of TB isolation ward at Nyahururu G.K Prison |
3,800,000 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 23 |
Improvement of kwa Nganga Emmanuel village road |
2,819,066 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 24 |
Routine maintenance of Nyahururu town estate roads grading watering and compaction |
1,771,900 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 25 |
Grading, gravelling and culvert installation at Kwa Nganga- Emmanuel village road |
2,819,065 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 26 |
Grading, gravelling and culvert installation at Mariakani - siberia-maina village road |
4,580,163 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 27 |
Grading, gravelling and culvert installation works at Manguo primary school |
2,253,856 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 28 |
Maintenance of Nyahururu town bus park |
4,358,661 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 29 |
Delivery and installation of solar/electrical items at Nyahururu market |
1,731,500 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 30 |
Renovation of Nyahururu Market |
919,242 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 31 |
Construction of a Boda boda shed at Mahianyu |
397,880 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 32 |
Construction of shoe shine sheds |
876,960 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 33 |
Rehabilitation of Laikipia west subcounty offices |
360,664 |
Completed |
Not Provided |
Not Provided |
48 |
22 |
| 34 |
Acquisition and distribution of household items for fire victims |
687,880 |
Under Procurement |
Not Provided |
Not Provided |
48 |
22 |
| 35 |
Equipping,furnishing and service delivery at Nyahururu fire stations |
775,827 |
Completed |
Not Provided |
Not Provided |
48 |
22 |
| 36 |
Compaction and rehailitation of Nyahururu dumpsite |
918,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 37 |
Being payment of compaction of Nyahururu dumpsite |
679,760 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 38 |
Renovation of Nyahururu Social hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 39 |
Renovation of Nyahururu stadium |
3,996,896 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 40 |
Supply of training equipment at Nyahururu VTC |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 41 |
Construction electrical workshop in Nyahururu VTC |
2,980,776 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 42 |
Support to setting up of E-subsidyfertilizer County satellite stores |
66,429 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 43 |
Construction of phase one works at Gituamba cereals warehouse |
4,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 44 |
Proposed Renovations of Muhotetu Dispensary |
2,784,046 |
Completed |
Not Provided |
Not Provided |
49 |
13 |
| 45 |
Supply and delivery of pipes and fittings to Kachima and Wamaria eloto Pipeline |
1,017,450 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 46 |
King'oka Kang'a multiporpose water project |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 47 |
Improvement of mairo-saba kwa mbega road;grading,gravelling and drainage |
4,346,520 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 48 |
Improvement of kande-forest road;grading,gravelling and drainge |
4,858,544 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 49 |
Improvement of kirit-muguongo road;drainge works,grading and gravelling |
4,559,182 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 50 |
Repair and maintenance – Karandi Market |
1,000,000 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 51 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 52 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 53 |
Grading, gravelling and culvert installation at Imela Gardens road |
2,499,046 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 54 |
Culverts bridge installation at Laikipia west technical access road |
2,919,894 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 55 |
Grading, gravelling and culvert installation at muthanduku to Muhotetu girls road |
4,772,736 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 56 |
Grading, gravelling and culvert installation at Gathinji Majani road |
4,925,899 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 57 |
Grading gravelling and culvert installation at Kwanjiku to jigali road |
1,511,248 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 58 |
Construction of ablution block at Tandare Market |
1,705,200 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 59 |
Construction of ablution block at Gatundia market |
1,693,890 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 60 |
Construction of Boda Boda Shed at Karandi |
395,680 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 61 |
Munyu water project (Supply and delivery of pipes for extension) |
999,810 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 62 |
Development of Marmanet Social Hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 63 |
Supply of training equipment for Muhotetu |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 64 |
Supply of training equipment for Marmanet |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 65 |
Construction of Ol ngarua primary school ECDE classroom |
1,718,325 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 66 |
Solarization Of Salama Secondary Borehole |
1,019,700 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 67 |
Supply and delivery of borehole consumables (wangwachi) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 68 |
supply and delivery of borehole consumables (Eloiloi ECDE) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 69 |
supply and delivery of borehole consumables (Kiriko primary) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 70 |
Eloiloi mulitpurpose water project |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 71 |
Environmental restoration through agroforestry in Mlima meza,construction of water tank |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 72 |
Improvement of gathangu kiahuko road,grading and gravelling |
2,913,514 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 73 |
Raya culvert bridge installation |
3,040,814 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 74 |
Improvement of Marura dam-Rumuruti border road-Olmoran ward |
4,997,882 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 75 |
Improvement of vee-plot 10 roads;grading and gravelling |
2,688,115 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 76 |
Improvement of Mbogoini centre –Sosian border road Olmoran ward |
4,664,882 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 77 |
Phase 2 fencing of Thome market |
1,301,032 |
Completed |
Not Provided |
Not Provided |
53 |
14 |
| 78 |
Improvement of Olmoran centre-Mbombo roads Olmoran ward |
4,303,600 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 79 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 80 |
Murraming and compacting of ground at Sipili markets |
1,072,884 |
Completed |
Not Provided |
Not Provided |
53 |
10 |
| 81 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 82 |
Grading, gravelling and culvert installation works at raya centre-mlango 3 road |
3,332,301 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 83 |
Culvert installation works in Sipili location |
4,610,478 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 84 |
Grading, gravelling and culvert installation at wanini- slaughter- Karai road |
3,219,667 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 85 |
Culvert installation works in Wangwachi location |
4,180,640 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 86 |
Grading, gravelling and culvert installation at Kiamariga centre- Teresa- githutha gatati road |
4,841,997 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 87 |
Culvert installation works in Olmoran location |
2,436,475 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 88 |
Supply and delivery of pipes in Pesi Marura water project |
999,700 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 89 |
Reinforcement of concrete septic at Sipili market |
1,398,913 |
Completed |
Not Provided |
Not Provided |
53 |
10 |
| 90 |
Supply of Training equipment for VTC Salama |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
14 |
| 91 |
Construction of Matigari primary school ECDE classroom |
1,927,490 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 92 |
Grading and digging of drainages at Olmoran Catholic- Miharate Primary road |
1,999,828 |
Completed |
Not Provided |
Not Provided |
51 |
10 |
| 93 |
Supply,delivery and pipe fitting at Olmoran water project |
997,182 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 94 |
Procurement and supply of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 95 |
Construction of Pit latrine and renovation of Sipili slaughter house |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 96 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 97 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 98 |
Supply of training equipment at Sipili VTC |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
10 |
| 99 |
Construction of Metha primary school ECDE classroom |
1,700,594 |
Completed |
Not Provided |
Not Provided |
50 |
10 |
| 100 |
Provision of soil analysis services |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 101 |
Desilting and expansion of Tangi Nyeusi dam |
911,285 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 102 |
Renovation Works at Naibor Dispensary |
913,082 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 103 |
Construction of VIP Pit Latrine at Naibor Dispensary |
1,674,060 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 104 |
Supply and delivery of Skip bins |
996,000 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 105 |
Environmental restoration through agroforestry |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 106 |
Livelihood Surpport programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 107 |
Grading and gravelling of road |
3,765,998 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 108 |
Grading and gravelling of roads |
3,770,980 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 109 |
Grading and gravelling of roads |
2,287,201 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 110 |
Grading and gravelling at ereri to todra |
3,721,802 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 111 |
Renovation and Facelift Works at Naibor Dispensary |
913,082 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 112 |
Construction of VIP Pit Latrine in Segera Ward |
1,674,060 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 113 |
Supply and delivery of pipes for water project |
996,030 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 114 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 115 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 116 |
Culvert installation works |
282,400 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 117 |
Grading and spot gravelling of fresh gold to Segera gate mission road |
1,994,620 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 118 |
Grading, gravelling, culvert installation and drainage works |
3,025,701 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 119 |
Grading, gravelling at Ereri Islamic centre to Endana primary road |
3,683,580 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 120 |
Grading, gravelling and culvert installation works |
3,197,586 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 121 |
Grading and spot gravelling at Fresh gold area |
1,994,620 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 122 |
Construction of another Loading ramp at Rumuruti |
670,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 123 |
Construction of a VIP pit latrine toilet |
750,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 124 |
Majimengi borehole multipurpose water project |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 125 |
Establishment of modern tree nursery |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 126 |
Supply and delivery of pipes for water project |
1,020,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 127 |
Compaction of Rumuruti dumpsite |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 128 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 129 |
Culverts installation works |
3,937,620 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 130 |
Culvert installation works |
3,506,440 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 131 |
Culvert installation works |
2,799,660 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 132 |
Culvert installation works |
3,595,420 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 133 |
Renovation & Extension Works of OPD |
4,534,902 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 134 |
Construction of Septic Tank (90,000 ltr ) |
2,812,092 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 135 |
Construction of Ablution Block |
4,505,214 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 136 |
Grading, gravelling and culvert installation |
3,994,808 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 137 |
Grading, gravelling and culvert installation |
3,546,193 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 138 |
Grading, gravelling and culvert installation |
3,936,228 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 139 |
Construction of Rumuruti fresh Market stalls (Block 2) |
13,558,382 |
Ongoing |
Not Provided |
Not Provided |
53 |
11 |
| 140 |
Construction of Shoe Shine Shades |
581,392 |
Completed |
Not Provided |
Not Provided |
53 |
11 |
| 141 |
Refurbishment of building of Rumuruti social hall |
6,402,162 |
Completed |
Not Provided |
Not Provided |
51 |
11 |
| 142 |
Supply and delivery of pipes and fittings |
982,759 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 143 |
Procurement of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 144 |
Partitioning of the Rumuruti Livestock Market (Sale-yard) Paddocks |
2,193,680 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 145 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 146 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 147 |
Supply of training equipment |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
11 |
| 148 |
Construction of Kinamba Slaughter house |
5,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 149 |
Construction of Dispensary |
6,877,547 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 150 |
Hydrological Survey and Drilling of Borehole |
1,652,665 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 151 |
Supply And Delivery Of Borehole Consumables |
1,019,800 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 152 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 153 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 154 |
Kiwanja Secondary school borehole multipurpose water project |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 155 |
Investment in climate smart agriculture |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 156 |
Improvement of road; grading and drainage works |
4,963,002 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 157 |
Improvement of road; grading, gravelling and drainage works |
1,948,800 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 158 |
Grading,gravelling and drainage works |
3,187,912 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 159 |
Improvement of pcea-boma road; grading, gravelling and drainage |
3,852,070 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 160 |
Grading and murraming of open market |
180,684 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 161 |
Repair and maintenance of market stalls |
1,000,000 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 162 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 163 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 164 |
Grading, gravelling and culvert installation works |
4,682,389 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 165 |
Grading, gravelling and culvert installation works |
2,214,869 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 166 |
Grading, gravelling and culvert installation works |
4,404,957 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 167 |
Rehabilitation of Githiga market |
998,320 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 168 |
Construction of a Boda boda shed |
396,314 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 169 |
Supply and delivery of solar panels |
999,108 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 170 |
Construction of ECDE classroom |
1,927,490 |
Completed |
Not Provided |
Not Provided |
50 |
12 |
| 171 |
Provision of soil analysis services |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 172 |
Fencing of Matanya Dispensary |
3,258,973 |
Completed |
Not Provided |
Not Provided |
49 |
2 |
| 173 |
Supply and delivery of borehole consumables |
1,988,300 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 174 |
Promotion of poultry farming |
1,500,000 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 175 |
Environmental restoration through agroforestry |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 176 |
Culvert installation works at various crossing |
4,570,400 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 177 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 178 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 179 |
Calvert installation works at various roads |
4,771,170 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 180 |
Purchase of 28,300 cubic of gravel and gravelling |
2,449,340 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 181 |
Construction of ablution block |
1,753,490 |
Completed |
Not Provided |
Not Provided |
53 |
2 |
| 182 |
Equipping of Tigithi boys Borehole |
999,810 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 183 |
Supply of Training Equipment |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 184 |
Construction of Tigithi primary school ECDE classroom |
1,949,496 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 185 |
Procurement of 2 fish preservation freezers to organized fish farmers groups |
300,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 186 |
Provision of 2 fish feeds pelletizers to organized fish farmers groups |
600,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 187 |
Provision of 4 fishing seine nets to organized fish farming groups |
200,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 188 |
Provision of 800kg of starter fish feeds to organised fish farmers groups |
200,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 189 |
Procurement and distribution of 14 fish pond liners to the beneficiaries. |
2,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 190 |
Provision of 340,000fish fingerlings to fish farmers |
1,700,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 191 |
Provision of 200,000 fish fingerlings to fish farmers |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 192 |
Procurement of hygiene enhancement tools and equipment (Stun gun, cartridges, soaps detergents, protective gear for meat inspectors etc) |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 193 |
Livestock vaccinations against trade sensitive diseases |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 194 |
Procurement and distribution of Milk safety equipment (Alcohol Testing Guns) to milk Cooperatives. |
400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 195 |
Phase 2 promotion of Soya bean growing in the County (Distribution of Soya bean seeds - 3.3 tonnes) |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 196 |
Super Napier (Pakchong) stocks (Cuttings) distribution |
400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 197 |
Rangeland Reseeding Range Pasture seeds (Cenchrus celliaries & Eragrostis superba) |
600,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 198 |
Boma Rhodes Pasture Seeds distribution |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 199 |
Promotion & Breeds improvement project (Procurement and distribution of Large white Pigs - 25 Boars & Sows) |
1,200,000 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 200 |
Breeds improvement (Procurement and distribution of Dairy Goats - 46 German Alpines) |
1,400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 201 |
Supply and delivery of 10 tonne self propelled vibration drum roller |
13,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 202 |
Renovation (extra works) at the Nyahururu County Referral Hospital Mother & Child Unit to improve the theatres and the geneal internal outlook |
2,794,509 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 203 |
Equipping and Operationalisation of the First Lakipia Blood Transfusion Satellite Centre in Nanyuki |
2,995,398 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 204 |
Supply Delivery, Installation, Testing and Commisioning of Liquid Oxygen Tank (6000 litres) to NTRH (as counterpart support) in Partnership with WHO and CHAI) [Total Cost of the Project: 22 million]. |
1,047,584 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 205 |
Installation of Oxygen Infrastructure at Nyahururu, Rumuruti, Nanyuki and Ndindika Hospitals in Laikipia in collaboration with the Global Fund / Amref Health Africa in Kenya (Multi-Year Project) |
121,018,888 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 206 |
Conversion of Rumuruti Health Staff Houses to Offices at Rumuruti Municipality |
3,658,772 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 207 |
Supply, Delivery, Installation, Testing and Commissioning of Renal Unit, Water Treatment Plant at NTRH (Multi-Year Project) |
33,500,000 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 208 |
Supply, Delivery, Installation, Testing and Commissioning of Theathre Equipment at Rumuruti Sub-County Hospital (Multi-Year Project) |
42,278,835 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 209 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Ndindika Sub-County Hospital (Multi-Year Project) |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 210 |
Supply,delivery, installation,testing and commissioning of Maternity and Theatre Equipment at NCRH (Multi-Year Project) |
96,061,700 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 211 |
Leasing and Maintenance of Radiology Equipment in the LHS |
609,108,386 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 212 |
Leasing and maintenance of Renal Dialysis Equipment in the LHS [10 Units in NCRH and 5 additional Units in NTRH (Multi-Year Project) |
96,297,500 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 213 |
Rehabilitation and Repair of 8 boreholes |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 214 |
Rehabilitation and Repair of 9 boreholes |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 215 |
Supply And Delivery Of Detergents |
591,900 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 216 |
Supply And Delivery Of Laptops |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 217 |
Supply And Delivery Of Personal Protective Equipments(Ppes) Countywide |
1,407,342 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 218 |
Supply And Delivery Of Skip Bins County Wide |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 219 |
Supply and delivery of borehole submersible and motor for the rig |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 220 |
Supply and delivery of tree seedlings |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 221 |
Supply and delivery of borehole consumables county wide |
15,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 222 |
Water harvesting Tanks for kitchen gardens, drinking in schools and health facilities |
4,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 223 |
Expansion of OPD and the Emergency Department at Nanyuki Teaching and Referral Hospital |
16,696,057 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 224 |
Supply, Delivery, Installation, Testing & Commisioning of a Washing Machine, Drier & Ironer to Nanyuki Teaching and Referral Hospital |
18,537,462 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 225 |
Construction and Installation (including servicing and ongoing spare parts maintenance for the first three years) of an Industrial Scale Medical Waster Incinerator Plant at Nanyuki Teaching and Referral Hospital |
39,668,868 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 226 |
Construction of a County Blood Transfusion Service Satellite Centre at Nanyuki Teaching and Referral Hospital |
8,275,173 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 227 |
Supply, Delivery, Installation, Testing and Commissioning of Renal Unit, Water Treatment Plant at Nanyuki Teaching and Referral Hospital |
33,500,000 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 228 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Rumuruti Sub-County Hospital (Multi-Year Project) |
42,278,835 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 229 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Ndindika Sub-County Hospital (Multi-Year Project) |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 230 |
Supply, Delivery, Installation, Testing & Commissioning of Maternity and Theatre Equipment to Nyahururu County Referral Hospital (Multi-Year Project) |
96,061,700 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 231 |
Leasing and Maintenance of Radiology Equipment in the Laikipia Health Service |
609,108,386 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 232 |
Leasing and Maintenance of Renal Dialysis Equipment in the Laikipia Health Service [10 Units in Nyahururu County Referral Hospital with a full water treatment plant; 5 additional Units in Nanyuki Teaching and Referral Hospital] (Multi-Year Project) |
96,297,500 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 233 |
Supply and delivery of high mast maintenance items and electrical materials |
1,692,811 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 234 |
Supply and delivery of electrical maintenance items |
2,378,240 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 235 |
Laikipia County Development Revolving |
27,400,000 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 236 |
Laikipia County Enterprise Fund |
4,082,538 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 237 |
Leasing of rental vehicles |
30,000,000 |
Completed |
Not Provided |
Not Provided |
51 |
1 |
| 238 |
Repair and maintenance of boreholes in Laikipia west |
3,451,084 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 239 |
Distribution of indigenous and exotic tree seedlings for growing |
994,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 240 |
Purchase of Skip bins |
1,972,180 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 241 |
procured slaughterhouse hygiene enhancement tools and equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 242 |
Promotion of Soya bean growing in the County (Distribution of Soya bean seeds - 10.0 tonnes) |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 243 |
Livestock vaccinations against trade sensitive diseases |
2,843,039 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 244 |
Stocking of fish ponds and dams with fingerlings |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 245 |
KYISA-Planning and holding youth sports events |
2,500,000 |
Completed |
Not Provided |
Not Provided |
50 |
0 |
| 246 |
Governor’s Cup Planning and holding youth sports event |
30,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 247 |
Fencing Works at Nakwang Dispensary |
2,740,082 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 248 |
Delivery and supply of borehole consumables for Githima borehole |
1,020,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 249 |
Supply and delivery of borehole consumables (Kadutura/Mathenge village Rehabilitation Centre) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 250 |
Lerai multipurpose water project |
6,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 251 |
Improvement of Nkalamare-Minjore road;opening and grading works |
4,394,400 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 252 |
Improvement of Lonyek-Lera road;opening and grading works |
4,416,120 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 253 |
Improvement of Posta-KMC-Kirimon road;opening and grading works |
1,881,520 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 254 |
Improvement of Lorara-Ngaremare road;opening and grading works |
3,206,820 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 255 |
Phase 2 fencing of Posta Market |
1,092,720 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 256 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 257 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 258 |
Fencing and the installation of gate at Rabal Dispensary |
935,830 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 259 |
Construction of a 4 door pit latrine and Urinal at Rabal dispensary |
666,540 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 260 |
Road improvement of container- island school road |
2,191,008 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 261 |
Road improvement of Ngaremere – minjore road |
3,213,200 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 262 |
Road improvement of survey tarmac- survey town road |
2,705,700 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 263 |
Road improvement of Posta – kmc road (section 1) |
3,337,320 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 264 |
Chainlink fencing at Posta market in Sosian ward |
1,614,256 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 265 |
Construction of a Boda boda shed at Kandutura |
396,314 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 266 |
Repair and servicing of Lowambene borehole |
999,572 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 267 |
Construction of Lorora school primary ECDE classroom |
1,718,325 |
Completed |
Not Provided |
Not Provided |
50 |
6 |
| 268 |
Construction of Seek Dispensary |
10,627,648 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 269 |
Opening,grading,gravelling and culvert installation works |
3,940,230 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 270 |
Opening and grading,culvert installation works |
3,515,960 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 271 |
Opening,grading at Seki to Wakumbe phase 2 |
2,701,350 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 272 |
Opening grading and gravelling works |
3,816,922 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 273 |
Construction of public toilet at Ewaso trading center |
1,500,000 |
Completed |
Not Provided |
Not Provided |
53 |
8 |
| 274 |
Construction of a Loading ramp at Ewaso Koija livestock Market |
580,000 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 275 |
Construction of a modern livestock market at Ewaso Koija |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 276 |
livelihood diversification, (apiculture) |
1,949,745 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 277 |
Livelihood Support Programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 278 |
Repair Of Tura Borehole Rising Main And Distribution Lines |
499,148 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 279 |
supply and delivery of rain water harvesting tanks |
1,200,000 |
Ongoing |
Not Provided |
Not Provided |
54 |
8 |
| 280 |
Tiamamut dam multipurpose water project |
4,800,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 281 |
supply and delivery of borehole consumables (Lochaki water project) |
3,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 282 |
Procurement and distribution of drought recovery seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 283 |
Repair and maintenance of Ewaso borehole |
999,572 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 284 |
Rehabilitation of Koija star bed |
793,592 |
Completed |
Not Provided |
Not Provided |
53 |
8 |
| 285 |
Construction of a 4-Door Pit Latrine with Urinal |
1,300,470 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 286 |
Supply and delivery of Mortuary equipment at Kimanjo sub-county hospital |
2,989,792 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 287 |
Extension works at Kimanjo subcounty hospital mortuary building |
4,360,539 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 288 |
Opening, grading and culvert installation |
3,253,504 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 289 |
Opening and grading works of Seek to Kipsing road |
2,302,136 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 290 |
Grading, works at Doldol to Kipsing road |
1,037,040 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 291 |
Opening and grading of Doldol to Saraba to kulum to lotim |
4,739,617 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 292 |
Construction of ECDE classroom |
1,700,032 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 293 |
Construction of ECDE classroom |
1,931,200 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 294 |
Construction completion of Bokish dispensary |
1,698,815 |
Completed |
Not Provided |
Not Provided |
49 |
9 |
| 295 |
Opening and grading works |
3,598,320 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 296 |
Grading and gravelling |
3,370,264 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 297 |
Routine maintanance works-grading and gravelling of seketeti-katanga |
3,624,594 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 298 |
Grading and gravelling works at ngenia centre gitugi to chetaah road |
3,178,371 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 299 |
Murraming of Chumvi market access roads |
1,023,240 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 300 |
Renovation of Dol Dol Slaughter house |
300,000 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 301 |
Provision of soil analysis services-300 samples |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 302 |
Desilting and Expansion of Ethi dam (Provision of fuel ) |
911,285 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 303 |
Rangeland Restoration and eradication of opuntia |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 304 |
Supply pipes to ostima Chumvi |
1,019,502 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 305 |
Nandunguro multipurpose water project |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 306 |
supply and delivery of rain water harvesting tanks |
1,200,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 307 |
supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 308 |
Livelihood Surpport programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 309 |
Ethi borehole multipurpose water project |
2,800,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 310 |
Grading, gravelling works |
2,168,475 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 311 |
Grading, gravelling works at connection |
3,200,293 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 312 |
Grading and gravelling works |
2,735,164 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 313 |
Grading, gravelling and culvert installation |
3,130,492 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 314 |
Construction of a tourism resource centre |
2,155,756 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 315 |
Grading works at Lotasha primary towards Ethi |
1,809,310 |
Completed |
Not Provided |
Not Provided |
51 |
9 |
| 316 |
Repair of 30*80 Doldol greenhouse construction of corchineal propagation house and fencing of the area |
999,807 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 317 |
Supply and delivery of pipes for Ngarendare Melau Enayeu water project |
998,760 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 318 |
Procurement of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 319 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 320 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 321 |
Construction of Sieku primary school ECDE Classroom |
1,699,203 |
Completed |
Not Provided |
Not Provided |
50 |
9 |
| 322 |
Renovation of Nanyuki slaughterhouse |
700,000 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 323 |
Renovation and Equipping of the Baraka Dispensary |
1,499,694 |
Completed |
Not Provided |
Not Provided |
49 |
3 |
| 324 |
Investment in climate smart agriculture |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 325 |
supply and delivery of borehole consumables (Sweet waters) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 326 |
Welcome signboard – Nanyuki Equator |
1,457,424 |
Ongoing |
Not Provided |
Not Provided |
53 |
3 |
| 327 |
Supply and delivery of pipes and fittings for Kalalu Ndemu water project |
1,018,100 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 328 |
Supply and delivery of borehole consumables (Bingwa Pri School) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 329 |
Supply and delivery of borehole consumables (Githuchi Dispensary) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 330 |
Murraming of Old markets/Mutumba market |
1,859,492 |
Completed |
Not Provided |
Not Provided |
53 |
3 |
| 331 |
Rehabilitation of multipurpose Mailisita dam |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 332 |
Grading and gravelling works at Daiga cess to Daiga primary school road |
3,437,370 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 333 |
Grading and gravelling at Runda Estate to ACK Laneto Seventhday advertist to blessed brains |
4,033,552 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 334 |
Grading and gravelling works at mama Karina to AIPCA road |
2,897,912 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 335 |
Grading and culvert installation at Mburugutia Mirera road |
3,630,200 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 336 |
Grading and gravelling works Mwireri world vision to MCK Mwireri and Murega road |
2,738,296 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 337 |
Grading and gravelling works at Kwa Ngata Kariuki charity to Kina road |
2,256,339 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 338 |
Grading, gravelling and culvert installation at Kwa father road near jesus imact church |
2,222,125 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 339 |
Grading and gravelling works at Gitugi road |
2,417,092 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 340 |
Grading, gravelling and culvert installation at PEFA to Imani Jonior and Stadium area |
3,826,550 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 341 |
Installation of milk value addition plant for Umande Cooparative |
997,600 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 342 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
5 |
| 343 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 344 |
Equipping of Medical Equipment at Maili Nane Dispensary |
2,983,000 |
Completed |
Not Provided |
Not Provided |
49 |
5 |
| 345 |
Renovations and Equipping of the Baraka Dispensary |
1,499,694 |
Completed |
Not Provided |
Not Provided |
49 |
3 |
| 346 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 347 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 348 |
Grading, gravelling and culvert installation works at P.C.E.A Mirera road |
3,155,988 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 349 |
Grading, gravelling and culvert installation works at Ruai road |
3,253,104 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 350 |
Grading, gravelling and culvert installation at Njogu ini road makanisa to tracer post |
3,302,520 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 351 |
Grading, gravelling and culvert installation at boni road in Thingithu ward |
1,735,737 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 352 |
Grading and gravelling works at Tetu primary to Tetu secondary |
1,340,078 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 353 |
Grading and gravelling works at Maili sita to mbara special school |
3,665,484 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 354 |
Rehabilitation of Mitumba market in Thingithu |
1,981,776 |
Completed |
Not Provided |
Not Provided |
53 |
3 |
| 355 |
Grading, gravelling and culvert installation at Kirimara bethel and Irungu road (0.8km) |
2,682,790 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 356 |
Grading, gravelling and culvert installation at Chania road to mama Kinya |
2,312,286 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 357 |
Flushing of and repair of borehole and pump-Sweet waters borehole |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 358 |
Construction of a 3 door pit latrine |
900,000 |
Completed |
Not Provided |
Not Provided |
48 |
1 |
| 359 |
Grading and gravelling works at AIC to Kwa Munyu in Umande ward |
1,294,560 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 360 |
Renovation of Nanyuki Social hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 361 |
Renovation works of Nanyuki stadium |
4,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 362 |
Grading, gravelling works at Kalalu market |
994,320 |
Completed |
Not Provided |
Not Provided |
53 |
5 |
| 363 |
Construction of Sweetwaters primary school ECDE classroom |
1,911,587 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 364 |
EX WEBB borehole (Supply, delivery, join and lay of pipes) |
998,235 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 365 |
Renovations and completion of a Dispensary |
3,577,846 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 366 |
Renovations and completion of Muhonia Dispensary |
4,978,210 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 367 |
Rehabilitation of Kaimenyi water Project |
998,800 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 368 |
Construction of Daiga primary school ECDE classroom |
1,697,671 |
Completed |
Not Provided |
Not Provided |
50 |
21 |
| 369 |
Supply and delivery of borehole consumables (Sirma Karandi) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 370 |
Supply and delivery of borehole consumables (kijabeWater Project) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 371 |
Wamura multipurpose water project. |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 372 |
Drainage works |
0 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 373 |
Grading and gravelling works |
3,229,730 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 374 |
Grading and gravelling works |
1,765,520 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 375 |
Grading and gravelling works at Pangama road |
1,777,178 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 376 |
Grading and gravelling works |
3,507,297 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 377 |
Grading and gravelling works |
3,616,590 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 378 |
Construction of Boda boda sheds at Imenti,Wamula and Matopeni |
1,192,445 |
Completed |
Not Provided |
Not Provided |
53 |
1 |
| 379 |
Renovations and Completion of Dispensary |
3,577,846 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 380 |
Renovations and Completion of Muhonia Dispensary |
4,978,210 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 381 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 382 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 383 |
Grading, gravelling and culvert installation and drainage works at Segera primary road |
4,937,540 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 384 |
Grading, gravelling and culvert installation at plot poa to Makutano road |
3,524,544 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 385 |
Grading, gravelling and culvert installation at marina to gushei road |
2,884,920 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 386 |
Supply of water tanks at Wiyumiririe |
450,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 387 |
Supply and delivery of pipes at Kiandege water project |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 388 |
Supply of training equipment for VTC Wiyumiririe |
5,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 389 |
Grading and gravelling at Randos Road |
2,025,766 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 390 |
Grading, gravelling and drainage works at Nanyuki Elimu Acadmy to Likii Bridge |
2,258,462 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 391 |
Grading, gravelling and drainage works at Millimani kwa Mama Lilian Road and surrounds |
1,274,420 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 392 |
Grading and gravelling and culvert installation works at Kingat road to Kwa Mwangi to Jehova witness and Zeth road |
2,709,609 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 393 |
Hire of gravel pit to excavate gravel and supply of crusher run to Rehabilitate roads |
2,920,300 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 394 |
Installation of solar panel and water tanks at Ukumbusho Market |
1,513,742 |
Completed |
Not Provided |
Not Provided |
53 |
4 |
| 395 |
Construction of new and repair of existing Boda boda sheds at Majengo and Kabiru |
999,514 |
Completed |
Not Provided |
Not Provided |
53 |
4 |