| 1 |
Drilling and equipping of a borehole at vetinary |
3,296,766 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 2 |
Periodic maintainance of Mariakani road |
8,827,396 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 3 |
Rehabilitation and drainage works at kimathi and chief camp nanyuki |
2,303,885 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 4 |
Periodic maintainance of Ngei estate - mathenge mirugi - nanyuki pri |
9,082,675 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 5 |
Construction of Proposed Mukuri bridge |
11,807,152 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 6 |
Periodic maintainance of Machakos road phase I |
14,052,301 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 7 |
Grading of Murigu Rd – 0.3 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 8 |
Grading of Maina - Mandera Rd – 0.6 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 9 |
Grading of Kamau – Mungai Rd – 0.4 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 10 |
Grading of Head Master Nguyo Rd – 0.4 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 11 |
Grading of Wa – Mutungu – Shosho Karis - 1.4 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 12 |
Grading of Mukuri Main Road – 1.8 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 13 |
Grading of Kasisi Acess Road – 0.25 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 14 |
Grading and gravelling works of Likii B road -0.3km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 15 |
Grading and gravelling works of Bus park (Area 52mx31.5m & 9mx12m) |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 16 |
Grading and gravelling works of Gichimo road-1km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 17 |
Grading and gravelling works of Mama mukungi road-0.3km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 18 |
Grading and gravelling works of Teacher karuri road-0.3km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 19 |
Grading and gravelling works of Mwika road-0.4km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 20 |
Grading and gravelling works of Njungle master road-0.2km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 21 |
Grading and gravelling works of Likii ngima roads-1km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 22 |
Grading and gravelling works of Lilian Road-1.8km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 23 |
Grading and gravelling works of Kihono raod 1.2km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 24 |
Grading and gravelling works of Mama Mburu road 1.5 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 25 |
Grading and gravelling works of Kenya Fibre roads 2.3 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 26 |
Grading and gravelling works of Maina - Mandera Rd – 0.9 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 27 |
Grading and gravelling works of Kamau – Mungai Rd – 0.7 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 28 |
Grading and gravelling works of Head Master Nguyo Rd – 0.7 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 29 |
Gravelling works of Lillian Rds – 1 Km (Grading) and 0.3 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 30 |
Gravelling works of Ha Milkah Rds – 0.9 Km (Grading) and 0.75 Km (Gravelling) |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 31 |
Gravelling works of Salim Rd – 0.4 Km (Grading) and 0.2 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 32 |
Grading and gravelling works of Rev Mwaniki Rd – 0.75 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 33 |
Grading and gravelling works of Wa Kabiru Rd - 1.6 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 34 |
Grading and gravelling works of Muthamia Rd – 2.3 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 35 |
Grading and gravelling works of Runyenje Rd – 1.1 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 36 |
Grading and gravelling works of St Jude – Dam - Nkando Primary – 3.3 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 37 |
Periodic Maintainance of Old market phase III rd |
9,110,486 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 38 |
Equipping of Matanya Health Centre Borehole |
3,189,036 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 39 |
Grading , gravelling works at Kwa jonson kiachu rd |
3,564,970 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 40 |
Grading and gravelling at weruini bridge road |
2,869,260 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 41 |
Grading of Borehole Road – 1.7 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 42 |
Grading of the Junction – Bore hole road – 1 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 43 |
Grading of Baraka – Bridge – 1.5 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 44 |
Grading of Solio – Baraka - 1.7 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 45 |
Grading of AIPCEA Road – 2 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 46 |
Grading of PCEA -Macadamia Primary Road – 1.7 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 47 |
Grading of Jeremiah - Posho Mill – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 48 |
Grading of Thutu - Commercial Plot – 0.15 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 49 |
Grading of Ha Macharia – Rehema – 0.45 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 50 |
Grading of Wanjohi – Wangui Njagi – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 51 |
Grading of Kimiti – Matu – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 52 |
Grading of Githae – Kiriko – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 53 |
Grading of Mama Isaiah – Kirumba – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 54 |
Grading of Mwihaki – Kinyua Karuri – 0.35 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 55 |
Grading of Tarmac – Mukamiro – Tarmac – 1.4 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 56 |
Grading of Maina Road – 0.1 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 57 |
Grading of Thitu – Ndururi - Tarmac – 0.1 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 58 |
Grading of Maina – Tarmac – 0.1 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 59 |
Grading of Stwiri – Muchina – 0.84 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 60 |
Grading of Gichinga – Muchina - 0.87 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 61 |
Grading of Ha Kuria – Solio Primary – Karue – 1 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 62 |
Grading of Mama Regina – Ha Kuria – 0.5 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 63 |
Grading of Mama Regina-Solio Primary-Independent-0.9 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 64 |
Grading of Muchina – Tarmac – 1.3 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 65 |
Grading of Kahiti – Bilalu – 1 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 66 |
Grading of Karwe – 4 Acres – 0.3 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 67 |
Grading of Miano – Bagichi – 1.2 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 68 |
Grading of Kangema – Mukamuru – 1.2 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 69 |
Grading of Thumbi – Gicheru – 1.5 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 70 |
Grading of Rwimbo -Gathua Road – 1.2 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 71 |
Grading of Muugu – Furaha Nursery School – 1.2 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 72 |
Grading of Kagwirii – Wasoro Road – 1.2 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 73 |
Grading of Malee – Solio Village Road – 0.5 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 74 |
Grading of Malee – Matanya Road – 1.4 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 75 |
Grading and gravelling of Irioko – Waguthiro road – 3.5 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 76 |
Grading and gravelling of Matanya -Waguthiru Road 2.4 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 77 |
Grading and gravelling of Irioko – River – Mwea – 2.2 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 78 |
Grading and gravelling of Waguthiro – Irioko - 1.8 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 79 |
Grading and gravelling of Matanya - Jesus Winner – 2.5 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 80 |
Grading and gravelling of Mother Teresa rd - 2.4 km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 81 |
Grading and gravelling of Tigithi ward-ngobit ward boarder road-1.7 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 82 |
Grading and gravelling of Nyakio day-mtetezi-waithira road-4 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 83 |
Grading and gravelling of Karai- nyakio day sec-gatangi wakinya dam- 4.8 km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 84 |
Grading and gravelling of Kalalu pcea-acc office-1.5km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 85 |
Grading and gravelling of Matanya police post- matanya main road-0.7km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 86 |
Grading and gravelling of Wagithiro secondary-matanya catholic-0.8km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 87 |
Grading and gravelling of Junction iriuko-daktari road-0.3km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 88 |
Grading and gravelling of Junction Iriuko-Iriuko primary-0.4km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 89 |
Grading and gravelling of Wanguthiro nursery-iroko-3.3km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 90 |
Grading and gravelling of V.G Bridge road-1km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 91 |
Grading and gravelling of Matanya dispensary-kibubungi primary-3.9km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 92 |
Grading and gravelling of Weruine Primary Junction-matanya dispensary- 0.9km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 93 |
Grading and gravelling of Wanaruona -Weruine -1.4km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 94 |
Grading and gravelling of Chaka Reli- Waguthiru ECDE – 1.5 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 95 |
Grading and gravelling of the Catholic Waguthiru – 0.3 Km road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 96 |
Grading and gravelling of Wanguthiro _ Matanya road – 2.4 km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 97 |
Grading and gravelling of Wachanga Road – 1.9 km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 98 |
Construction of classroom and water harvesting facilities Iriuko ECDE |
1,595,000 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 99 |
Grading and gravelling of Kamureshi Road – 1.95 Graded 0.15 km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 100 |
Laying and pipes installation of Kite borehole |
1,898,928 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 101 |
Laying and pipes installation of Kite borehole |
1,898,928 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 102 |
Equipping of Mahianyu borehole |
1,650,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 103 |
Grading, gravelling and culvert works of Silale Estate road |
1,937,780 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 104 |
Periodic maintainace of Hospital rd |
27,785,482 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 105 |
Periodic maintenance of Boston House - Nyahururu law courts - Jimrocks rd |
18,317,511 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 106 |
Periodic maintenance of Thomson falls road |
9,687,425 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 107 |
Rehabilitation of Town Hall entrance |
4,043,250 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 108 |
Grading and gravelling of Emmanuel kwa njeri No 1 road. |
3,495,196 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 109 |
Grading and gravelling of Gwa-chairman - muchui- nyumba tatu road |
2,864,968 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 110 |
Grading of Agostino road |
2,291,000 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 111 |
Grading of Sirare Primary – Pencil road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 112 |
Grading of Sirare Primary (Tarmac) – Forest road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 113 |
Grading of Wandugire – Mukuruweine – Kianugu Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 114 |
Grading of Kundarira – Kanga C Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 115 |
Grading of Old Kundarira – Wambiro Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 116 |
Grading of Kaichakun Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 117 |
Grading of Kwa Wanjiku Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 118 |
Grading of Mariakani Junction-Siberia Cemetery road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 119 |
Grading of Rev. Kamiru Rd (Losogwa) |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 120 |
Grading of Maureen Academy – Dam road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 121 |
Grading of Losogwa Quarry-Kigumo Forest road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 122 |
Grading of Nanok-Bethieli Primary School Junction road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 123 |
Grading and gravelling of Kigumo road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 124 |
Grading and gravelling of ACK Rwathia road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 125 |
Grading and gravelling of Rwathia road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 126 |
Grading and gravelling of Table land- Shemanei road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 127 |
Grading and gravelling of Karangi road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 128 |
Grading and gravelling of Mbarakira-Step Innd-Table land |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 129 |
Grading and gravelling of Kigumo Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 130 |
Grading and gravelling of Nanok quarry road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 131 |
Grading and gravelling of Chairman road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 132 |
Grading and gravelling of Dorcas road to mbarakira road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 133 |
Grading and graveling of Nyumba Tatu-Kamukunj-Nanok Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 134 |
Grading and gravelling of Ol Jabet Hospital-Mariakani Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 135 |
Grading and gravelling of Maina Village Roads |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 136 |
Grading and gravelling of Mamboleo Estate Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 137 |
Grading and gravelling of Kamatu – Mr. Muchendu’s Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 138 |
Grading and gravelling of Gitangi – Bethiel Primary Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 139 |
Grading and gravelling of Teacher Mbochi - Heroes Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 140 |
Grading and graveling of Karuga - Action Praise Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 141 |
Grading and gravelling of Karuga – Karume Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 142 |
Construction of 91 Municipality ECDE Classroom |
1,597,015 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 143 |
Construction of ECDE classroom at Gatero |
1,599,851 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 144 |
Solarization of Miharati borehole |
1,750,698 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 145 |
Drilling of Kaharati borehole |
2,990,562 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 146 |
Development of Githima springs |
3,358,269 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 147 |
Drilling of Chemuga borehole |
3,299,274 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 148 |
Drilling of Kinguka-Kanga borehole |
3,009,356 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 149 |
Installation of Limunga-Baraka borehole |
3,076,792 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 150 |
Installation of Munyu-Kanjora borehole |
2,592,343 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 151 |
Installation of Majani borehole |
3,400,494 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 152 |
Periodic maintainace of Muthanduku - Munyu centre - Njoguini dispensary road |
6,631,380 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 153 |
Periodic maintainace of Gatero - Kaiti -Chung'uti road |
6,140,268 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 154 |
Grading and gravelling Kwa Wandeto - Mama Kuraru road |
4,991,528 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 155 |
Spot improvement at Muginu-Majani road |
4,925,220 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 156 |
Cabro paving and other infrastructure works at Ojabet centre |
116,000,000 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 157 |
Construction of classroom at Mairo ECDE |
1,596,462 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 158 |
Construction of classroom at Kwa - Wanjiku ECDE |
1,554,550 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 159 |
Construction of classroom at Munyu ECDE |
1,554,551 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 160 |
Solar Equiping, Piping and Construction of Water Kiosk |
2,901,642 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 161 |
Equipping of borehole |
344,852 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 162 |
Grading works |
0 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 163 |
Grading and gravelling works |
0 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 164 |
Grading and gravelling works |
4,407,188 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 165 |
Grading and gravelling works |
4,333,707 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 166 |
Grading, graveling and culvert installation |
3,972,644 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 167 |
Grading of the road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 168 |
Grading and gravelling works |
0 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 169 |
Purchase of pipes for water project |
769,000 |
Completed |
Not Provided |
Not Provided |
54 |
21 |
| 170 |
Grading and gravelling and culvert works |
4,501,960 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 171 |
Grading and gravelling |
2,000,420 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 172 |
Grading and gravelling |
1,812,964 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 173 |
Equiping of Borehole |
3,033,952 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 174 |
Grading, graveling and culvert installation |
3,495,196 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 175 |
Grading, graveling and culvert installation |
0 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 176 |
Construction of Musul Resources |
2,774,079 |
Completed |
Not Provided |
Not Provided |
50 |
0 |
| 177 |
Road opening, grading,gravelling and drainage works Chumvi bridge to arjijo ( NYS) road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 178 |
Grading and gravelling works Boran lodge to Ilingwesi rd |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 179 |
Grading and gravelling works of Road opening (Nadungoro - Tasia rd) |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 180 |
Grading and gravelling works of Mia Moja rd – Kirurumo Rd |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 181 |
Grading and gravelling works Timau Catholic – East Laikipia Dispensary Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 182 |
Grading and gravelling works Chief – Catholic - PCEA Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 183 |
Grading and gravelling works Ethi dispensary & Ethi Secondary & Ethi Police Post |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 184 |
Grading and gravelling works Ha Waigwa – Ethi Primary – 0.6 Km |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 185 |
Grading and gravelling works Borana Main Rd – PCEA Kiriko Rd |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 186 |
Grading and gravelling works Christioan Rd |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 187 |
Grading and gravelling works PCEA Ethi – Kiriko Rd |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 188 |
Grading and gravelling works of Rotasha Road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 189 |
Pipeline extension of Murichu-Mathanji water project. |
3,433,861 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 190 |
Drilling of Nganoini borehole |
3,997,325 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 191 |
Equipping of Ndaragwiti borehole |
3,125,652 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 192 |
Grading and gravelling of Kaptogom - Gatheru - Mama Njeri road |
4,694,000 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 193 |
Grading and gravelling of Raya - kiamariga road |
4,471,997 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 194 |
Drilling of Othaya borehole |
3,410,882 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 195 |
Drilling of Kirima borehole |
3,412,134 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 196 |
Equipping of Ainapmoi borehole |
3,192,552 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 197 |
Grading and gravelling works of Graton to Chumvi Road |
4,899,811 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 198 |
Road opening and grading works of Doldol to Kurikuri-Sior road |
2,223,024 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 199 |
Construction of the New Sang'a Dispensary |
5,731,641 |
Ongoing |
Not Provided |
Not Provided |
49 |
9 |
| 200 |
Grading and gravelling works of Cess Point to Rotasha Road |
4,416,700 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 201 |
Construction of a Lotasha modern Livestock Sale-yard |
3,995,388 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 202 |
Drainage works and backfilling at Kiwanja Ndege to Sinoni road |
3,070,868 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 203 |
Drilling of Ethi borehole |
2,845,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 204 |
Supply of breeding galla bucks shulumai community land |
2,547,360 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 205 |
Purchase of assorted water pipes for Kurikuri and Sieku borehole |
2,393,750 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 206 |
Construction of offices for beadwork Sacco at Ngarandare |
2,000,000 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 207 |
Supply of branded plastic tanks for household and institution water harvesting across the ward |
1,892,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 208 |
Rangeland restoration and eradication of Opuntia at makurian community land |
1,890,800 |
Ongoing |
Not Provided |
Not Provided |
54 |
9 |
| 209 |
Completion of the New Bokish Dispensary |
1,698,815 |
Completed |
Not Provided |
Not Provided |
49 |
9 |
| 210 |
Construction of ECDE classroom at Kurikuri |
1,465,000 |
Ongoing |
Not Provided |
Not Provided |
50 |
9 |
| 211 |
Murraming of Ngarendare Market |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 212 |
Condemnation pit, water tank and water connections and fly trap at Doldol Slaughter |
900,000 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 213 |
Purchase and distribution of high value fruit tree seedlings wardwide. |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 214 |
Purchase and distribution of Certified Seeds wardwide. |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 215 |
Soil Sampling and testing wardwide. |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 216 |
Procurement and distribution of Fish Fingerlings wardwide |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 217 |
Construction of Njurum ECDE classroom and installationof water harvesting facility |
1,465,000 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 218 |
Construction of Seek Dispensary |
10,627,648 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 219 |
Construction of ECDE classroom and installation harvesting facility at kipaika primary |
3,936,228 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 220 |
Grading, gravelling and drainage works of Ilpolei to Soitundo Road |
3,828,000 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 221 |
Piping of water from Kimanjo borehole to Kimanjo center |
3,498,800 |
Ongoing |
Not Provided |
Not Provided |
54 |
8 |
| 222 |
Solarisation of Ndonyo AIC borehole |
3,498,050 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 223 |
Supply of galla bucks at mumonyot - soitoudo |
2,400,782 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 224 |
Construction of ablution block at Salt lick VTC |
1,998,581 |
Ongoing |
Not Provided |
Not Provided |
50 |
8 |
| 225 |
Supply and delivery of assorted beehives and equipment wardwide |
1,877,808 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 226 |
Construction of ECDE classroom and installation harvesting facility at Nkiloriti primary. |
1,482,135 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 227 |
Construction of ECDE classroom and installation harvesting facility at Saramba primary. |
1,463,694 |
Ongoing |
Not Provided |
Not Provided |
50 |
8 |
| 228 |
Construction of ECDE classroom and installation of water harvesting facility at Ltinja-musul primary |
1,432,634 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 229 |
Construction of ECDE classroom and installation of water harvesting facility at nosirai primary. |
1,432,634 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 230 |
Construction of Bodaboda shed at Soitoudo |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
8 |
| 231 |
Procurement and distribution of Fish Fingerlings wardwide |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 232 |
Construction of the Outpatient Block at Island Dispensary . |
6,582,425 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 233 |
Improvement of Kandutura Nkalemare road |
4,983,800 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 234 |
Rehabilitation of Lerai/Rum rum multipurpose water project |
4,460,050 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 235 |
Improvement of Magadi- Loinek road. |
4,199,750 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 236 |
Improvement of Ol'motonyi road |
3,829,450 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 237 |
Installation of floodlights at Maundi Meri and at Posta |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 238 |
Purchase and distribution of high value fruit tree seedlings. |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 239 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 240 |
Soil Sampling and testing wardwide |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 241 |
Supply and delivery of borehole equipment for table land borehole |
1,499,900 |
Ongoing |
Not Provided |
Not Provided |
54 |
22 |
| 242 |
Excavation spreading and compaction of Nyahururu dumpsite |
1,485,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 243 |
Development of Kigumo multi-purpose water project |
7,581,451 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 244 |
Construction of Bodaboda sheds |
1,029,317 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 245 |
Construction of the Pit Latrine at Maili Saba Dispensary |
799,762 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 246 |
Supply and Installation of Mother and Child Unit Equipment at Nyahururu County Referral Hospital |
96,061,700 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 247 |
Spot improvement of Cornerio-Gichuru road |
4,980,170 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 248 |
Improvement of Nanok Junction-Bethiel School road |
3,528,418 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 249 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 250 |
Improvement of Plot 10-ACK Church-Mukurweini road |
4,790,916 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 251 |
Improvement of Oljabet Mariakani Primary road |
3,831,955 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 252 |
Backfilling and reinstatement of excavated Site |
1,449,420 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 253 |
Improvement of Kabai Kiragu road |
4,349,188 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 254 |
Improvement of frontage parking and road parking lot in Nyahururu town |
13,798,560 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 255 |
Boundary fencing at Nyahururu dumpsite |
6,233,243 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 256 |
Construction of 10 door pit latrines at Kundarilla primary school and ECDE |
1,693,430 |
Completed |
Not Provided |
Not Provided |
51 |
22 |
| 257 |
Construction of ECDE classroom at Muthengera |
1,460,904 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 258 |
Construction of ECDE classroom at – Nakwales |
1,458,711 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 259 |
Renovation of dormitory /washrooms and kitchen at Nyahururu VTC |
2,992,028 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 260 |
Installation of high-level lighting system within Nyahururu sports stadium |
1,499,184 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 261 |
Fabrication of Nyahururu fire engine |
1,004,576 |
Completed |
Not Provided |
Not Provided |
48 |
22 |
| 262 |
Roofing and fencing of Nyahururu veterinary clinic |
997,660 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 263 |
Renovation of Nyahururu Slaughter house-Gate and loading bay shed |
500,000 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 264 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 265 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 266 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 267 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 268 |
Supply and delivery of assorted tree seedlings for agroforestry |
3,039,200 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 269 |
Supply and delivery of 6820 one-day old improved Kienyeji chicks |
1,019,590 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 270 |
Renovation and Completion of the existing Maternity Building at Matanya Dispensary |
4,797,308 |
Ongoing |
Not Provided |
Not Provided |
49 |
2 |
| 271 |
Construction of the New Male Dispensary |
6,980,010 |
Ongoing |
Not Provided |
Not Provided |
49 |
2 |
| 272 |
Supply of theatre equipment toLamuria Sub County Hospital |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
2 |
| 273 |
Construction of ECDE classroom - Mwiyogo |
1,433,900 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 274 |
Construction of ECDE classroom - Nyakio |
1,459,056 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 275 |
Equipping of Tigithi Milk Cooling Plant |
3,121,810 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 276 |
Installation of fish pond liners |
175,000 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 277 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 278 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 279 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 280 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 281 |
Grading and gravelling using County machine |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 282 |
Culverts installation in Tigithi ward |
0 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 283 |
Grading, gravelling and drainage works of roads |
4,919,038 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 284 |
Equipping of Wamura borehole |
4,490,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 285 |
Construction of Sanitation Facilities, and the Equipping of the Muhonia Dispensary |
7,798,710 |
Ongoing |
Not Provided |
Not Provided |
49 |
1 |
| 286 |
Construction of Sanitation Block, Fencing and the Equipping of the Wamura Dispensary |
8,482,290 |
Ongoing |
Not Provided |
Not Provided |
49 |
1 |
| 287 |
Installation of a 3-phase 12KW super capacitor power bank-based Solar system |
4,489,471 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 288 |
Grading, gravelling and drainage works of Road |
4,382,451 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 289 |
Construction of a 2 door pit latrine |
500,001 |
Completed |
Not Provided |
Not Provided |
51 |
1 |
| 290 |
Completion of workshop Wiyumiririe VTC |
1,997,867 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 291 |
Construction of ECDE classroom - Oltafeta |
1,464,245 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 292 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 293 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 294 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 295 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 296 |
Culvert Installation |
2,849,723 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 297 |
Grading, gravelling and drainage works of Road |
2,912,064 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 298 |
Grading, gravelling and drainage works of Nyala - Elimu Academy Road |
3,474,664 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 299 |
Road grading, gravelling and drainage works |
4,940,614 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 300 |
Supply and delivery of borehole equipment for Kinamba bus park borehole |
1,498,990 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 301 |
Pipeline extensions of Kiwanja ndege |
3,498,600 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 302 |
Equipping and solarisation of Kinamba bus park borehole |
3,231,800 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 303 |
Installation of floodlights at Mastoo trading centre |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 304 |
Construction of the Septic Tank (90 cubic metres capacity) at Ndindika Sub County Hospital |
4,642,151 |
Ongoing |
Not Provided |
Not Provided |
49 |
12 |
| 305 |
Construction of the Radiology & Physiotherapy Units, and the Extension of the Laboratory at the Ndindika Sub County Hospital |
4,703,382 |
Ongoing |
Not Provided |
Not Provided |
49 |
12 |
| 306 |
Construction of a Morgue at Ndindika Sub County Hospital |
5,868,460 |
Ongoing |
Not Provided |
Not Provided |
49 |
12 |
| 307 |
Renovation of Existing Buildings to convert to a Proposed Dialysis Unit at Ndindika Sub County Hospital |
2,442,497 |
Ongoing |
Not Provided |
Not Provided |
49 |
12 |
| 308 |
Fencing (and other related facility improvement) works at Miteta Dispensary |
4,309,702 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 309 |
Supply of theatre equipment to Ndindika |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 310 |
Construction of ECDE classroom Ngerecha |
1,465,000 |
Completed |
Not Provided |
Not Provided |
50 |
12 |
| 311 |
Construction of ECDE classroom Kariaini |
1,464,018 |
Completed |
Not Provided |
Not Provided |
50 |
12 |
| 312 |
External works at Kinamba Slaughter house |
1,997,955 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 313 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 314 |
Purchase and distribution of coffee seedlings |
0 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 315 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 316 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 317 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 318 |
Grading, gravelling and drainage works of Mwenje Umoja-Kamukunji road. |
2,809,810 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 319 |
Grading, gravelling and drainage works of Nyakiambi ACK- Lobere road |
3,472,170 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 320 |
Grading, gravelling and drainage works of Ndaiga 18 road |
4,978,053 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 321 |
Grading, gravelling and drainage works of GG Mugaa -Kinamba road |
3,935,967 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 322 |
Supply and delivery of assorted tree seedlings for agroforestry |
2,718,344 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 323 |
Demarcation and repair of Nanyuki cemetery fence |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 324 |
Compaction of Nanyuki dumpsite |
1,100,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 325 |
Supply of bee-hives & their accessories |
1,852,404 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 326 |
Construction of the New Njoguini Dispensary |
6,700,612 |
Ongoing |
Not Provided |
Not Provided |
49 |
3 |
| 327 |
Installation of fish pond liners |
175,000 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 328 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 329 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 330 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 331 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 332 |
Installation of drip kits |
2,393,750 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 333 |
Piping Ruai and Maka green water project |
2,393,750 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 334 |
Grading and gravelling using County machine |
0 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 335 |
Grading, gravelling and drainage works of Ol Pejeta Air Base Fence road |
4,261,538 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 336 |
Grading, gravelling and drainage works of Muchina Road |
2,453,632 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 337 |
Grading, gravelling and drainage accesses to Falcon Disabled Offices and Palliative Hospital |
814,111 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 338 |
Rehabilitation of selected urban road in Nanyuki township |
4,036,220 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 339 |
Rehabilitation of selected urban road in Nanyuki township lot 2 |
4,036,220 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 340 |
Grading, gravelling and drainage works of Kilimo (3rd And 5th Avenue) road |
4,298,682 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 341 |
Grading, gravelling and drainage works of Bluegum road, |
4,261,550 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 342 |
Gravelling and drainage works of Ruai South road |
4,865,040 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 343 |
Grading, gravelling and drainage works of Mwai Tosha road |
4,125,308 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 344 |
Grading, gravelling and drainage work of Dispensary-Nabosa road |
4,977,212 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 345 |
Grading, gravelling and drainage works of Kagondu road |
3,199,280 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 346 |
Grading, gravelling and drainage works of Burugutia- Cattle Dip road |
4,890,096 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 347 |
Establishment and maintenance of three modern tree nursery sites |
4,695,796 |
Completed |
Not Provided |
Not Provided |
54 |
4 |
| 348 |
Purchase of motor vehicle |
5,500,000 |
Completed |
Not Provided |
Not Provided |
53 |
4 |
| 349 |
Construction of the Incinerator Building at NTRH |
4,415,210 |
Ongoing |
Not Provided |
Not Provided |
49 |
4 |
| 350 |
Interior Designs Construction Works for the new OPD/ Emergency block at NTRH |
14,763,274 |
Completed |
Not Provided |
Not Provided |
49 |
4 |
| 351 |
Purchase of Advanced Life Support (ALS) Ambulance 4WD Hardtop for NTRH |
16,850,000 |
Completed |
Not Provided |
Not Provided |
49 |
4 |
| 352 |
Construction of ECDE classroom Muthaiga primary |
1,465,880 |
Completed |
Not Provided |
Not Provided |
50 |
4 |
| 353 |
Construction of ECDE classroom Mt Kenya primary |
1,465,880 |
Completed |
Not Provided |
Not Provided |
50 |
4 |
| 354 |
Supply and delivery of water tanks at CEDC |
499,500 |
Completed |
Not Provided |
Not Provided |
50 |
4 |
| 355 |
Construction of the administration block at CEDC |
1,497,719 |
Completed |
Not Provided |
Not Provided |
50 |
4 |
| 356 |
Fabrication of Nanyuki fire engine |
1,004,576 |
Ongoing |
Not Provided |
Not Provided |
48 |
4 |
| 357 |
Drilling and equipping of Nturukuma (mothers) project |
2,393,750 |
Ongoing |
Not Provided |
Not Provided |
47 |
4 |
| 358 |
Supply and distribution of ammunitions of Stun gun at Nanyuki slaughter house |
360,000 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 359 |
Installation of fish pond liners |
175,000 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 360 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 361 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 362 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 363 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 364 |
Grading and gravelling |
0 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 365 |
Grading and gravelling of 2.6km of Kirunyu road and Njau road |
3,410,748 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 366 |
Rehabilitation of selected urban road in nanyuki township |
4,951,808 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 367 |
Grading and gravelling of 2.4km of Mama Gaithuma road , Muriithi to Koogi road, Muriithi CMC road and Munjuki road |
3,051,264 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 368 |
Culverts installation |
3,396,155 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 369 |
Grading, gravelling and drainage works of Ndemu road and Kahiro road |
3,099,868 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 370 |
Grading, gravelling and drainage works of Thingithu Likii/Bridge road |
2,379,740 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 371 |
Grading, gravelling and drainage works of Mwatha-Marite-CEDC road |
2,654,892 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 372 |
Grading, gravelling and drainage works of Chelena Ntrukuma Cllr Kiguta roads, |
3,867,411 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 373 |
Likii titling process |
9,990,000 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 374 |
Equipping of Mugumo water project |
5,299,762 |
Completed |
Not Provided |
Not Provided |
54 |
21 |
| 375 |
Grading and gravelling |
0 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 376 |
Grading, gravelling of Muthomi Riungu- Kongoni Gathogo -Njuki – Rungurua road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 377 |
Repair of bodaboda sheds across the ward |
1,005,000 |
Completed |
Not Provided |
Not Provided |
53 |
21 |
| 378 |
Opening, grading and gravelling of Wamugunda Road 1.7km and Kamurugu to Kamindo 1km Road |
4,893,257 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 379 |
Road opening, grading, gravelling and drainage of Ngata Old Tarmac -Mbabu Mwenzi and Bethel to Mwalimu Mama Mum road |
4,006,640 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 380 |
Road opening, grading, gravelling and drainage works of Mufiri - Mwangi Kigathi Junction to Mama Manji and Behind Katheri Junction roads |
4,662,620 |
Completed |
Not Provided |
Not Provided |
52 |
21 |
| 381 |
Construction of ECDE classroom and installation of water harvesting facilities at Gakeu |
1,464,036 |
Completed |
Not Provided |
Not Provided |
50 |
21 |
| 382 |
Construction of ECDE classroom and installation of water harvesting facilities at Kaumbuko |
1,463,526 |
Completed |
Not Provided |
Not Provided |
50 |
21 |
| 383 |
Fencing and tree planting of Tetu dam |
2,393,750 |
Completed |
Not Provided |
Not Provided |
47 |
21 |
| 384 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
21 |
| 385 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
21 |
| 386 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
21 |
| 387 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
21 |
| 388 |
Rehabilitation of Kaharati borehole |
3,128,000 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 389 |
Delivery of assorted tree seedlings for agroforestry |
1,919,742 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 390 |
Construction of a masonry water storage tank at Mlima meza |
1,993,710 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 391 |
Grading, gravelling and drainage works of Mama Maina-Kimani-Mkafeli-Kenways road |
4,666,083 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 392 |
Culvert installation works at Marura Sub-location and routine maintenance of Sipili town centre roads |
4,944,055 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 393 |
Grading, gravelling and drainage works of Gathoni-Karingu-Maku-New Dawn road |
3,969,404 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 394 |
Grading, gravelling and drainage works of Sipili Kwa Mbogo to Mbogoini Minjore Boda road |
4,949,093 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 395 |
Construction of ablution block and kitchen at Olmoran VTC |
3,001,546 |
Ongoing |
Not Provided |
Not Provided |
50 |
10 |
| 396 |
Construction of ECDE classroom and water harvesting facilities at Mbogoini |
1,464,986 |
Completed |
Not Provided |
Not Provided |
50 |
10 |
| 397 |
Construction of Sipili livestock Sale-yard |
2,000,000 |
Ongoing |
Not Provided |
Not Provided |
47 |
10 |
| 398 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 399 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 400 |
Purchase and distribution of high value fruit tree seedlings across the ward |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 401 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 402 |
Rehabilitation of Naituria borehole |
3,719,000 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 403 |
Equipping of Kinguka kanga borehole |
4,490,600 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 404 |
Construction of bodaboda sheds |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 405 |
Construction of Gatundia Centre Culverts |
3,135,341 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 406 |
Grading, gravelling and drainage works of Columbus Kinyutu dam road |
4,400,496 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 407 |
Culvert bridge installation at Kabia Chereta road |
3,053,990 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 408 |
Grading, Gravelling and drainage works of JCC church-Oljabet slaughter house-Prosper roads |
2,401,080 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 409 |
Grading, gravelling and drainage works of Muhotetu Junior road |
2,998,820 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 410 |
Construction of Gatirima primary bridge |
2,109,251 |
Ongoing |
Not Provided |
Not Provided |
51 |
13 |
| 411 |
Construction of masonry workshop at Muhotetu VTC |
993,714 |
Ongoing |
Not Provided |
Not Provided |
50 |
13 |
| 412 |
Construction of ECDE classroom and installation water harvesting facilities at Thigio |
1,465,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 413 |
Construction of ECDE classroom and installation water harvesting facilities at -Gatami |
1,449,147 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 414 |
Development of Gituamba warehouse |
7,571,494 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 415 |
Supply of assorted tree seedlings for agroforestry |
1,320,080 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 416 |
Construction of vaccination crushes |
1,199,788 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 417 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 418 |
Supply of breeding galla bucks |
2,400,782 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 419 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 420 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 421 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 422 |
Establishment modern tree nursery sites |
1,400,555 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 423 |
Construction of the New Endana Dispensary |
6,974,221 |
Ongoing |
Not Provided |
Not Provided |
49 |
7 |
| 424 |
National tree planting celebration |
700,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 425 |
Equipping and rehabilitation of Kirima boreholes |
3,495,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 426 |
Grading, gravelling and drainage works of Mukima -Taji Estate roads. |
3,642,400 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 427 |
Grading and gravelling of Segera gate to Segera Mission Hospital and Surrounding Roads |
4,872,928 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 428 |
Grading, gravelling and drainage work of Jua Kali to Tuutuu road. |
4,632,460 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 429 |
Equipping of Majimengi multipurpose water project |
3,407,900 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 430 |
Grading and gravelling of Lairagwan road |
1,931,400 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 431 |
Grading, graveling and drainage works of Jua Kali; Kuku road |
4,637,680 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 432 |
Funding of Aggregated Industrial Park |
77,764,660 |
Ongoing |
Not Provided |
Not Provided |
53 |
11 |
| 433 |
Grading, gravelling and drainage works of Endana Elkarama road |
4,600,908 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 434 |
Construction of Bodaboda sheds |
1,060,000 |
Completed |
Not Provided |
Not Provided |
53 |
11 |
| 435 |
Construction of the Septic Tank at Rumuruti Sub County Hospital |
1,665,215 |
Ongoing |
Not Provided |
Not Provided |
49 |
11 |
| 436 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 437 |
Installation of the Grid-Tied Single-Phase Solar System at the CHMT Headquarters / SCHMT Laikipia West offices in Rumuruti |
3,552,940 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 438 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 439 |
Refurbishment of CHMT Offices at the LHS Headquarters in Rumuruti |
4,760,257 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 440 |
Extension Works to the Proposed CECM & CO offices in Rumuruti |
1,649,346 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 441 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 442 |
Supply of theatre equipment to Rumuruti Sub County Hospital |
42,278,835 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 443 |
Installation of 2 containers at finance office |
4,265,500 |
Completed |
Not Provided |
Not Provided |
51 |
11 |
| 444 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 445 |
Equipping food processing workshop Rumuruti VTC |
1,204,892 |
Ongoing |
Not Provided |
Not Provided |
50 |
11 |
| 446 |
Construction of ECDE classroom at Magomano |
1,465,000 |
Completed |
Not Provided |
Not Provided |
50 |
11 |
| 447 |
Equipping of Eloiloi bore hole |
4,342,450 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 448 |
Construction of the New Kiamariga Dispensary |
6,915,809 |
Ongoing |
Not Provided |
Not Provided |
49 |
14 |
| 449 |
Construction of ECDE classroom at Kahari |
1,448,010 |
Completed |
Not Provided |
Not Provided |
50 |
11 |
| 450 |
Construction of ECDE classroom at Muruku |
1,448,724 |
Ongoing |
Not Provided |
Not Provided |
50 |
14 |
| 451 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 452 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 453 |
Procurement and distribution of Fish Fingerlings |
33,333 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 454 |
Renovation of Rumuruti slaughterhouse |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 455 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 456 |
Supply and distribution of Veterinarian Fridge and deep freezer |
360,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 457 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 458 |
Installation / piping of water at Rumuruti Sale-yard |
199,254 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 459 |
Purchase and distribution of high value fruit tree seedlings |
446,428 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 460 |
Improvement of Gatwukira-Nganoine roads |
4,069,280 |
Ongoing |
Not Provided |
Not Provided |
52 |
14 |
| 461 |
Purchase and distribution of Certified Seeds |
353,571 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 462 |
Grading, gravelling and drainage works of Ndei Rv.Muraya-Main Road |
2,939,730 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 463 |
Soil Sampling and testing |
42,857 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 464 |
Grading, gravelling and drainage works of Raya-Fundi Culvert-Gikaria Road |
2,380,900 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 465 |
Road opening, grading, gravelling and drainage works 2.6km of Simotwo - Ainapmoi road |
4,970,148 |
Ongoing |
Not Provided |
Not Provided |
52 |
11 |
| 466 |
Grading, gravelling and drainage works of Karuaho-Muruku Road |
4,983,650 |
Ongoing |
Not Provided |
Not Provided |
52 |
11 |
| 467 |
Culvert bridge installation at Kiamariga |
4,212,120 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 468 |
Acquisition of major asset |
25,525,800 |
Ongoing |
Not Provided |
Not Provided |
52 |
11 |
| 469 |
Improvement of Pesi Centre roads |
2,396,125 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 470 |
Culvert installation at Kiambiriria Juction, Kiguru Road Juction, Fiesta Hotel and Opposite Shepherd Hotel |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 471 |
Improvement of Salama Centre-Catholic-Cutline road |
2,808,662 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 472 |
Installation of close curvet in Kandutura road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 473 |
Improvement of Catholic-PCEA-Salama main road |
2,262,290 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 474 |
Grading of Livestock market access roads |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 475 |
Grading of Kiambiriria to Manyata primary |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 476 |
Grading and gravelling of Soko mjinga to moonlight |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 477 |
Grading and gravelling of Ngomongo shop junction main road |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 478 |
Grading and graveling of Ngomongo area access roads |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 479 |
Grading and graveling of Kiambirira to kandutura bridge |
0 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 480 |
Grading, gravelling and drainage works of Mwanzi-Mutamaiyo road |
4,338,922 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 481 |
Acquisition of major asset |
88,213,800 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 482 |
Provision Of Soil Analysis Services-300 samples |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 483 |
Renovation of Nyahururu Slaughter house |
5,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 484 |
Routine maintenance of cluster ii roads in nyahururu town |
4,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 485 |
Routine maintenance of cluster 1 roads in nyahururu town |
4,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 486 |
Kigumo multipurpose water project |
8,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 487 |
Improvement of thiga – macira road opening grading, gravelling and drainage |
4,982,126 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 488 |
Being Payment For Compaction Of Nyahururu Dumpsite |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 489 |
Improvement of oljabet hospital – pcea chemichemi road grading, gravelling and drainage |
2,648,167 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 490 |
Compaction Of Nyahururu Dumpsite |
1,498,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 491 |
Improvement of juakali sagak road grading and gravelling |
1,679,494 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 492 |
Supply And Delivery Of Pipes For Krudger Water Project |
1,019,900 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 493 |
Improvement of karuga nanok junction- action praise road grading, gravelling and drainage |
4,560,424 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 494 |
Construction of market shades - Nyahururu |
2,055,926 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 495 |
Thomson gate and general repairs |
1,027,968 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 496 |
supply and delivery of borehole consumables (Table land) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 497 |
Repair and maintenance of markets- Cereal Market |
998,656 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 498 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 499 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
22 |
| 500 |
Extension and modernization of OPD at NCRH |
2,780,789 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 501 |
Extension of Cabro Pavement at NCRH |
4,397,038 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 502 |
Construction of Modern ablution block in outpatient area at NCRH |
4,798,000 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 503 |
Construction of TB isolation ward at Nyahururu G.K Prison |
3,800,000 |
Completed |
Not Provided |
Not Provided |
49 |
22 |
| 504 |
Improvement of kwa Nganga Emmanuel village road |
2,819,066 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 505 |
Routine maintenance of Nyahururu town estate roads grading watering and compaction |
1,771,900 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 506 |
Grading, gravelling and culvert installation at Kwa Nganga- Emmanuel village road |
2,819,065 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 507 |
Grading, gravelling and culvert installation at Mariakani - siberia-maina village road |
4,580,163 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 508 |
Grading, gravelling and culvert installation works at Manguo primary school |
2,253,856 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 509 |
Maintenance of Nyahururu town bus park |
4,358,661 |
Completed |
Not Provided |
Not Provided |
52 |
22 |
| 510 |
Delivery and installation of solar/electrical items at Nyahururu market |
1,731,500 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 511 |
Renovation of Nyahururu Market |
919,242 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 512 |
Construction of a Boda boda shed at Mahianyu |
397,880 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 513 |
Construction of shoe shine sheds |
876,960 |
Completed |
Not Provided |
Not Provided |
53 |
22 |
| 514 |
Rehabilitation of Laikipia west subcounty offices |
360,664 |
Completed |
Not Provided |
Not Provided |
48 |
22 |
| 515 |
Equipping,furnishing and service delivery at Nyahururu fire stations |
775,827 |
Completed |
Not Provided |
Not Provided |
48 |
22 |
| 516 |
Compaction and rehailitation of Nyahururu dumpsite |
918,000 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 517 |
Being payment of compaction of Nyahururu dumpsite |
679,760 |
Completed |
Not Provided |
Not Provided |
54 |
22 |
| 518 |
Construction of ECDE classroom |
1,700,600 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 519 |
Renovation of Nyahururu Social hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 520 |
Renovation of Nyahururu stadium |
3,996,896 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 521 |
Supply of training equipment at Nyahururu VTC |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 522 |
Construction electrical workshop in Nyahururu VTC |
2,980,776 |
Completed |
Not Provided |
Not Provided |
50 |
22 |
| 523 |
Support to setting up of E-subsidyfertilizer County satellite stores |
66,429 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 524 |
Construction of phase one works at Gituamba cereals warehouse |
4,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 525 |
Proposed Renovations of Muhotetu Dispensary |
2,784,046 |
Completed |
Not Provided |
Not Provided |
49 |
13 |
| 526 |
Supply and delivery of pipes and fittings to Kachima and Wamaria eloto Pipeline |
1,017,450 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 527 |
King'oka Kang'a multiporpose water project |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 528 |
Improvement of mairo-saba kwa mbega road;grading,gravelling and drainage |
4,346,520 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 529 |
Improvement of kande-forest road;grading,gravelling and drainge |
4,858,544 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 530 |
Improvement of kirit-muguongo road;drainge works,grading and gravelling |
4,559,182 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 531 |
Repair and maintenance – Karandi Market |
1,000,000 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 532 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 533 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
13 |
| 534 |
Grading, gravelling and culvert installation at Imela Gardens road |
2,499,046 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 535 |
Culverts bridge installation at Laikipia west technical access road |
2,919,894 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 536 |
Grading, gravelling and culvert installation at muthanduku to Muhotetu girls road |
4,772,736 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 537 |
Grading, gravelling and culvert installation at Gathinji Majani road |
4,925,899 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 538 |
Grading gravelling and culvert installation at Kwanjiku to jigali road |
1,511,248 |
Completed |
Not Provided |
Not Provided |
52 |
13 |
| 539 |
Construction of ablution block at Tandare Market |
1,705,200 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 540 |
Construction of ablution block at Gatundia market |
1,693,890 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 541 |
Construction of Boda Boda Shed at Karandi |
395,680 |
Completed |
Not Provided |
Not Provided |
53 |
13 |
| 542 |
Munyu water project (Supply and delivery of pipes for extension) |
999,810 |
Completed |
Not Provided |
Not Provided |
54 |
13 |
| 543 |
Development of Marmanet Social Hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 544 |
Supply of training equipment for Muhotetu |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 545 |
Supply of training equipment for Marmanet |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 546 |
Construction of Ol ngarua primary school ECDE classroom |
1,718,325 |
Completed |
Not Provided |
Not Provided |
50 |
13 |
| 547 |
Solarization Of Salama Secondary Borehole |
1,019,700 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 548 |
Supply and delivery of borehole consumables (wangwachi) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 549 |
supply and delivery of borehole consumables (Eloiloi ECDE) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 550 |
supply and delivery of borehole consumables (Kiriko primary) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 551 |
Eloiloi mulitpurpose water project |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 552 |
Environmental restoration through agroforestry in Mlima meza,construction of water tank |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 553 |
Improvement of gathangu kiahuko road,grading and gravelling |
2,913,514 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 554 |
Raya culvert bridge installation |
3,040,814 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 555 |
Improvement of Marura dam-Rumuruti border road-Olmoran ward |
4,997,882 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 556 |
Improvement of vee-plot 10 roads;grading and gravelling |
2,688,115 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 557 |
Improvement of Mbogoini centre –Sosian border road Olmoran ward |
4,664,882 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 558 |
Phase 2 fencing of Thome market |
1,301,032 |
Completed |
Not Provided |
Not Provided |
53 |
14 |
| 559 |
Improvement of Olmoran centre-Mbombo roads Olmoran ward |
4,303,600 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 560 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 561 |
Murraming and compacting of ground at Sipili markets |
1,072,884 |
Completed |
Not Provided |
Not Provided |
53 |
10 |
| 562 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
14 |
| 563 |
Grading, gravelling and culvert installation works at raya centre-mlango 3 road |
3,332,301 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 564 |
Culvert installation works in Sipili location |
4,610,478 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 565 |
Grading, gravelling and culvert installation at wanini- slaughter- Karai road |
3,219,667 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 566 |
Culvert installation works in Wangwachi location |
4,180,640 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 567 |
Grading, gravelling and culvert installation at Kiamariga centre- Teresa- githutha gatati road |
4,841,997 |
Completed |
Not Provided |
Not Provided |
52 |
14 |
| 568 |
Culvert installation works in Olmoran location |
2,436,475 |
Completed |
Not Provided |
Not Provided |
52 |
10 |
| 569 |
Supply and delivery of pipes in Pesi Marura water project |
999,700 |
Completed |
Not Provided |
Not Provided |
54 |
14 |
| 570 |
Reinforcement of concrete septic at Sipili market |
1,398,913 |
Completed |
Not Provided |
Not Provided |
53 |
10 |
| 571 |
Supply of Training equipment for VTC Salama |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
14 |
| 572 |
Construction of Matigari primary school ECDE classroom |
1,927,490 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 573 |
Grading and digging of drainages at Olmoran Catholic- Miharate Primary road |
1,999,828 |
Completed |
Not Provided |
Not Provided |
51 |
10 |
| 574 |
Supply,delivery and pipe fitting at Olmoran water project |
997,182 |
Completed |
Not Provided |
Not Provided |
54 |
10 |
| 575 |
Procurement and supply of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 576 |
Construction of Pit latrine and renovation of Sipili slaughter house |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 577 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 578 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
10 |
| 579 |
Supply of training equipment at Sipili VTC |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
10 |
| 580 |
Construction of Metha primary school ECDE classroom |
1,700,594 |
Completed |
Not Provided |
Not Provided |
50 |
10 |
| 581 |
Provision of soil analysis services |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 582 |
Desilting and expansion of Tangi Nyeusi dam |
911,285 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 583 |
Renovation Works at Naibor Dispensary |
913,082 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 584 |
Construction of VIP Pit Latrine at Naibor Dispensary |
1,674,060 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 585 |
Supply and delivery of Skip bins |
996,000 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 586 |
Environmental restoration through agroforestry |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 587 |
Livelihood Surpport programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 588 |
Grading and gravelling of road |
3,765,998 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 589 |
Grading and gravelling of roads |
3,770,980 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 590 |
Grading and gravelling of roads |
2,287,201 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 591 |
Grading and gravelling at ereri to todra |
3,721,802 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 592 |
Renovation and Facelift Works at Naibor Dispensary |
913,082 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 593 |
Construction of VIP Pit Latrine in Segera Ward |
1,674,060 |
Completed |
Not Provided |
Not Provided |
49 |
7 |
| 594 |
Supply and delivery of pipes for water project |
996,030 |
Completed |
Not Provided |
Not Provided |
54 |
7 |
| 595 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 596 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
7 |
| 597 |
Culvert installation works |
282,400 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 598 |
Grading and spot gravelling of fresh gold to Segera gate mission road |
1,994,620 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 599 |
Grading, gravelling, culvert installation and drainage works |
3,025,701 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 600 |
Grading, gravelling at Ereri Islamic centre to Endana primary road |
3,683,580 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 601 |
Grading, gravelling and culvert installation works |
3,197,586 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 602 |
Grading and spot gravelling at Fresh gold area |
1,994,620 |
Completed |
Not Provided |
Not Provided |
52 |
7 |
| 603 |
Construction of another Loading ramp at Rumuruti |
670,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 604 |
Construction of a VIP pit latrine toilet |
750,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 605 |
Majimengi borehole multipurpose water project |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 606 |
Establishment of modern tree nursery |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 607 |
Supply and delivery of pipes for water project |
1,020,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 608 |
Compaction of Rumuruti dumpsite |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 609 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 610 |
Culverts installation works |
3,937,620 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 611 |
Culvert installation works |
3,506,440 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 612 |
Culvert installation works |
2,799,660 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 613 |
Culvert installation works |
3,595,420 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 614 |
Renovation & Extension Works of OPD |
4,534,902 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 615 |
Construction of Septic Tank (90,000 ltr ) |
2,812,092 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 616 |
Construction of Ablution Block |
4,505,214 |
Completed |
Not Provided |
Not Provided |
49 |
11 |
| 617 |
Grading, gravelling and culvert installation |
3,994,808 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 618 |
Grading, gravelling and culvert installation |
3,546,193 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 619 |
Grading, gravelling and culvert installation |
3,936,228 |
Completed |
Not Provided |
Not Provided |
52 |
11 |
| 620 |
Construction of Shoe Shine Shades |
581,392 |
Completed |
Not Provided |
Not Provided |
53 |
11 |
| 621 |
Refurbishment of building of Rumuruti social hall |
6,402,162 |
Completed |
Not Provided |
Not Provided |
51 |
11 |
| 622 |
Supply and delivery of pipes and fittings |
982,759 |
Completed |
Not Provided |
Not Provided |
54 |
11 |
| 623 |
Procurement of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 624 |
Partitioning of the Rumuruti Livestock Market (Sale-yard) Paddocks |
2,193,680 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 625 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 626 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
11 |
| 627 |
Supply of training equipment |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
11 |
| 628 |
Construction of Kinamba Slaughter house |
5,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 629 |
Construction of Dispensary |
6,877,547 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 630 |
Hydrological Survey and Drilling of Borehole |
1,652,665 |
Completed |
Not Provided |
Not Provided |
49 |
12 |
| 631 |
Supply And Delivery Of Borehole Consumables |
1,019,800 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 632 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 633 |
Supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 634 |
Kiwanja Secondary school borehole multipurpose water project |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 635 |
Investment in climate smart agriculture |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 636 |
Improvement of road; grading and drainage works |
4,963,002 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 637 |
Improvement of road; grading, gravelling and drainage works |
1,948,800 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 638 |
Grading,gravelling and drainage works |
3,187,912 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 639 |
Improvement of pcea-boma road; grading, gravelling and drainage |
3,852,070 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 640 |
Grading and murraming of open market |
180,684 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 641 |
Repair and maintenance of market stalls |
1,000,000 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 642 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 643 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
12 |
| 644 |
Grading, gravelling and culvert installation works |
4,682,389 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 645 |
Grading, gravelling and culvert installation works |
2,214,869 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 646 |
Grading, gravelling and culvert installation works |
4,404,957 |
Completed |
Not Provided |
Not Provided |
52 |
12 |
| 647 |
Rehabilitation of Githiga market |
998,320 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 648 |
Construction of a Boda boda shed |
396,314 |
Completed |
Not Provided |
Not Provided |
53 |
12 |
| 649 |
Supply and delivery of solar panels |
999,108 |
Completed |
Not Provided |
Not Provided |
54 |
12 |
| 650 |
Construction of ECDE classroom |
1,927,490 |
Completed |
Not Provided |
Not Provided |
50 |
12 |
| 651 |
Provision of soil analysis services |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 652 |
Fencing of Matanya Dispensary |
3,258,973 |
Completed |
Not Provided |
Not Provided |
49 |
2 |
| 653 |
Supply and delivery of borehole consumables |
1,988,300 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 654 |
Promotion of poultry farming |
1,500,000 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 655 |
Environmental restoration through agroforestry |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 656 |
Culvert installation works at various crossing |
4,570,400 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 657 |
Procurement and distribution of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 658 |
Procurement and distribution of drought recovery fruit trees seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
2 |
| 659 |
Calvert installation works at various roads |
4,771,170 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 660 |
Purchase of 28,300 cubic of gravel and gravelling |
2,449,340 |
Completed |
Not Provided |
Not Provided |
52 |
2 |
| 661 |
Construction of ablution block |
1,753,490 |
Completed |
Not Provided |
Not Provided |
53 |
2 |
| 662 |
Equipping of Tigithi boys Borehole |
999,810 |
Completed |
Not Provided |
Not Provided |
54 |
2 |
| 663 |
Supply of Training Equipment |
500,000 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 664 |
Construction of Tigithi primary school ECDE classroom |
1,949,496 |
Completed |
Not Provided |
Not Provided |
50 |
2 |
| 665 |
Procurement of 2 fish preservation freezers to organized fish farmers groups |
300,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 666 |
Provision of 2 fish feeds pelletizers to organized fish farmers groups |
600,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 667 |
Provision of 4 fishing seine nets to organized fish farming groups |
200,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 668 |
Provision of 800kg of starter fish feeds to organised fish farmers groups |
200,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 669 |
Procurement and distribution of 14 fish pond liners to the beneficiaries. |
2,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 670 |
Provision of 340,000fish fingerlings to fish farmers |
1,700,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 671 |
Provision of 200,000 fish fingerlings to fish farmers |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 672 |
Procurement of hygiene enhancement tools and equipment (Stun gun, cartridges, soaps detergents, protective gear for meat inspectors etc) |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 673 |
Livestock vaccinations against trade sensitive diseases |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 674 |
Procurement and distribution of Milk safety equipment (Alcohol Testing Guns) to milk Cooperatives. |
400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 675 |
Phase 2 promotion of Soya bean growing in the County (Distribution of Soya bean seeds - 3.3 tonnes) |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 676 |
Super Napier (Pakchong) stocks (Cuttings) distribution |
400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 677 |
Rangeland Reseeding Range Pasture seeds (Cenchrus celliaries & Eragrostis superba) |
600,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 678 |
Boma Rhodes Pasture Seeds distribution |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 679 |
Promotion & Breeds improvement project (Procurement and distribution of Large white Pigs - 25 Boars & Sows) |
1,200,000 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 680 |
Breeds improvement (Procurement and distribution of Dairy Goats - 46 German Alpines) |
1,400,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 681 |
Supply and delivery of 10 tonne self propelled vibration drum roller |
13,900,000 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 682 |
Renovation (extra works) at the Nyahururu County Referral Hospital Mother & Child Unit to improve the theatres and the geneal internal outlook |
2,794,509 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 683 |
Equipping and Operationalisation of the First Lakipia Blood Transfusion Satellite Centre in Nanyuki |
2,995,398 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 684 |
Supply Delivery, Installation, Testing and Commisioning of Liquid Oxygen Tank (6000 litres) to NTRH (as counterpart support) in Partnership with WHO and CHAI) [Total Cost of the Project: 22 million]. |
1,047,584 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 685 |
Installation of Oxygen Infrastructure at Nyahururu, Rumuruti, Nanyuki and Ndindika Hospitals in Laikipia in collaboration with the Global Fund / Amref Health Africa in Kenya (Multi-Year Project) |
121,018,888 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 686 |
Conversion of Rumuruti Health Staff Houses to Offices at Rumuruti Municipality |
3,658,772 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 687 |
Supply, Delivery, Installation, Testing and Commissioning of Renal Unit, Water Treatment Plant at NTRH (Multi-Year Project) |
33,500,000 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 688 |
Supply, Delivery, Installation, Testing and Commissioning of Theathre Equipment at Rumuruti Sub-County Hospital (Multi-Year Project) |
42,278,835 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 689 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Ndindika Sub-County Hospital (Multi-Year Project) |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 690 |
Supply,delivery, installation,testing and commissioning of Maternity and Theatre Equipment at NCRH (Multi-Year Project) |
96,061,700 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 691 |
Leasing and Maintenance of Radiology Equipment in the LHS |
609,108,386 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 692 |
Leasing and maintenance of Renal Dialysis Equipment in the LHS [10 Units in NCRH and 5 additional Units in NTRH (Multi-Year Project) |
96,297,500 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 693 |
Rehabilitation and Repair of 8 boreholes |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 694 |
Rehabilitation and Repair of 9 boreholes |
4,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 695 |
Supply And Delivery Of Detergents |
591,900 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 696 |
Supply And Delivery Of Laptops |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 697 |
Supply And Delivery Of Personal Protective Equipments(Ppes) Countywide |
1,407,342 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 698 |
Supply And Delivery Of Skip Bins County Wide |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 699 |
Supply and delivery of borehole submersible and motor for the rig |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 700 |
Supply and delivery of tree seedlings |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 701 |
Supply and delivery of borehole consumables county wide |
15,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 702 |
Water harvesting Tanks for kitchen gardens, drinking in schools and health facilities |
4,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 703 |
Expansion of OPD and the Emergency Department at Nanyuki Teaching and Referral Hospital |
16,696,057 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 704 |
Supply, Delivery, Installation, Testing & Commisioning of a Washing Machine, Drier & Ironer to Nanyuki Teaching and Referral Hospital |
18,537,462 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 705 |
Construction and Installation (including servicing and ongoing spare parts maintenance for the first three years) of an Industrial Scale Medical Waster Incinerator Plant at Nanyuki Teaching and Referral Hospital |
39,668,868 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 706 |
Construction of a County Blood Transfusion Service Satellite Centre at Nanyuki Teaching and Referral Hospital |
8,275,173 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 707 |
Supply, Delivery, Installation, Testing and Commissioning of Renal Unit, Water Treatment Plant at Nanyuki Teaching and Referral Hospital |
33,500,000 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 708 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Rumuruti Sub-County Hospital (Multi-Year Project) |
42,278,835 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 709 |
Supply, Delivery, Installation, Testing & Commissioning of Theathre Equipment at Ndindika Sub-County Hospital (Multi-Year Project) |
42,264,935 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 710 |
Supply, Delivery, Installation, Testing & Commissioning of Maternity and Theatre Equipment to Nyahururu County Referral Hospital (Multi-Year Project) |
96,061,700 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 711 |
Leasing and Maintenance of Radiology Equipment in the Laikipia Health Service |
609,108,386 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 712 |
Leasing and Maintenance of Renal Dialysis Equipment in the Laikipia Health Service [10 Units in Nyahururu County Referral Hospital with a full water treatment plant; 5 additional Units in Nanyuki Teaching and Referral Hospital] (Multi-Year Project) |
96,297,500 |
Completed |
Not Provided |
Not Provided |
49 |
0 |
| 713 |
Supply and delivery of high mast maintenance items and electrical materials |
1,692,811 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 714 |
Supply and delivery of electrical maintenance items |
2,378,240 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 715 |
Laikipia County Development Revolving |
27,400,000 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 716 |
Laikipia County Enterprise Fund |
4,082,538 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 717 |
Leasing of rental vehicles |
30,000,000 |
Completed |
Not Provided |
Not Provided |
51 |
1 |
| 718 |
Repair and maintenance of boreholes in Laikipia west |
3,451,084 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 719 |
Distribution of indigenous and exotic tree seedlings for growing |
994,000 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 720 |
Purchase of Skip bins |
1,972,180 |
Completed |
Not Provided |
Not Provided |
54 |
0 |
| 721 |
procured slaughterhouse hygiene enhancement tools and equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 722 |
Promotion of Soya bean growing in the County (Distribution of Soya bean seeds - 10.0 tonnes) |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 723 |
Livestock vaccinations against trade sensitive diseases |
2,843,039 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 724 |
Stocking of fish ponds and dams with fingerlings |
1,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 725 |
KYISA-Planning and holding youth sports events |
2,500,000 |
Completed |
Not Provided |
Not Provided |
50 |
0 |
| 726 |
Governor’s Cup Planning and holding youth sports event |
30,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 727 |
Fencing Works at Nakwang Dispensary |
2,740,082 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 728 |
Delivery and supply of borehole consumables for Githima borehole |
1,020,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 729 |
Supply and delivery of borehole consumables (Kadutura/Mathenge village Rehabilitation Centre) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 730 |
Lerai multipurpose water project |
6,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 731 |
Improvement of Nkalamare-Minjore road;opening and grading works |
4,394,400 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 732 |
Improvement of Lonyek-Lera road;opening and grading works |
4,416,120 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 733 |
Improvement of Posta-KMC-Kirimon road;opening and grading works |
1,881,520 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 734 |
Improvement of Lorara-Ngaremare road;opening and grading works |
3,206,820 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 735 |
Phase 2 fencing of Posta Market |
1,092,720 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 736 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 737 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
6 |
| 738 |
Fencing and the installation of gate at Rabal Dispensary |
935,830 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 739 |
Construction of a 4 door pit latrine and Urinal at Rabal dispensary |
666,540 |
Completed |
Not Provided |
Not Provided |
49 |
6 |
| 740 |
Road improvement of container- island school road |
2,191,008 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 741 |
Road improvement of Ngaremere – minjore road |
3,213,200 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 742 |
Road improvement of survey tarmac- survey town road |
2,705,700 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 743 |
Road improvement of Posta – kmc road (section 1) |
3,337,320 |
Completed |
Not Provided |
Not Provided |
52 |
6 |
| 744 |
Chainlink fencing at Posta market in Sosian ward |
1,614,256 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 745 |
Construction of a Boda boda shed at Kandutura |
396,314 |
Completed |
Not Provided |
Not Provided |
53 |
6 |
| 746 |
Repair and servicing of Lowambene borehole |
999,572 |
Completed |
Not Provided |
Not Provided |
54 |
6 |
| 747 |
Construction of Lorora school primary ECDE classroom |
1,718,325 |
Completed |
Not Provided |
Not Provided |
50 |
6 |
| 748 |
Construction of Seek Dispensary |
10,627,648 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 749 |
Opening,grading,gravelling and culvert installation works |
3,940,230 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 750 |
Opening and grading,culvert installation works |
3,515,960 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 751 |
Opening,grading at Seki to Wakumbe phase 2 |
2,701,350 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 752 |
Opening grading and gravelling works |
3,816,922 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 753 |
Construction of public toilet at Ewaso trading center |
1,500,000 |
Completed |
Not Provided |
Not Provided |
53 |
8 |
| 754 |
Construction of a Loading ramp at Ewaso Koija livestock Market |
580,000 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 755 |
Construction of a modern livestock market at Ewaso Koija |
3,000,000 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 756 |
livelihood diversification, (apiculture) |
1,949,745 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 757 |
Livelihood Support Programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 758 |
Repair Of Tura Borehole Rising Main And Distribution Lines |
499,148 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 759 |
Supply and delivery of rain water harvesting tanks |
1,200,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 760 |
Tiamamut dam multipurpose water project |
4,800,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 761 |
supply and delivery of borehole consumables (Lochaki water project) |
3,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 762 |
Procurement and distribution of drought recovery seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
8 |
| 763 |
Repair and maintenance of Ewaso borehole |
999,572 |
Completed |
Not Provided |
Not Provided |
54 |
8 |
| 764 |
Rehabilitation of Koija star bed |
793,592 |
Completed |
Not Provided |
Not Provided |
53 |
8 |
| 765 |
Construction of a 4-Door Pit Latrine with Urinal |
1,300,470 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 766 |
Supply and delivery of Mortuary equipment at Kimanjo sub-county hospital |
2,989,792 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 767 |
Extension works at Kimanjo subcounty hospital mortuary building |
4,360,539 |
Completed |
Not Provided |
Not Provided |
49 |
8 |
| 768 |
Opening, grading and culvert installation |
3,253,504 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 769 |
Opening and grading works of Seek to Kipsing road |
2,302,136 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 770 |
Grading, works at Doldol to Kipsing road |
1,037,040 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 771 |
Opening and grading of Doldol to Saraba to kulum to lotim |
4,739,617 |
Completed |
Not Provided |
Not Provided |
52 |
8 |
| 772 |
Construction of ECDE classroom |
1,700,032 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 773 |
Construction of ECDE classroom |
1,931,200 |
Completed |
Not Provided |
Not Provided |
50 |
8 |
| 774 |
Construction completion of Bokish dispensary |
1,698,815 |
Completed |
Not Provided |
Not Provided |
49 |
9 |
| 775 |
Opening and grading works |
3,598,320 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 776 |
Grading and gravelling |
3,370,264 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 777 |
Routine maintanance works-grading and gravelling of seketeti-katanga |
3,624,594 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 778 |
Grading and gravelling works at ngenia centre gitugi to chetaah road |
3,178,371 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 779 |
Murraming of Chumvi market access roads |
1,023,240 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 780 |
Renovation of Dol Dol Slaughter house |
300,000 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 781 |
Provision of soil analysis services-300 samples |
26,667 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 782 |
Desilting and Expansion of Ethi dam (Provision of fuel ) |
911,285 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 783 |
Rangeland Restoration and eradication of opuntia |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 784 |
Supply pipes to ostima Chumvi |
1,019,502 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 785 |
Nandunguro multipurpose water project |
2,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 786 |
supply and delivery of rain water harvesting tanks |
1,200,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 787 |
supply and delivery of borehole consumables |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 788 |
Livelihood Surpport programme (goats breeding) |
3,100,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 789 |
Ethi borehole multipurpose water project |
2,800,000 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 790 |
Grading, gravelling works |
2,168,475 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 791 |
Grading, gravelling works at connection |
3,200,293 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 792 |
Grading and gravelling works |
2,735,164 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 793 |
Grading, gravelling and culvert installation |
3,130,492 |
Completed |
Not Provided |
Not Provided |
52 |
9 |
| 794 |
Construction of a tourism resource centre |
2,155,756 |
Completed |
Not Provided |
Not Provided |
53 |
9 |
| 795 |
Grading works at Lotasha primary towards Ethi |
1,809,310 |
Completed |
Not Provided |
Not Provided |
51 |
9 |
| 796 |
Repair of 30*80 Doldol greenhouse construction of corchineal propagation house and fencing of the area |
999,807 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 797 |
Supply and delivery of pipes for Ngarendare Melau Enayeu water project |
998,760 |
Completed |
Not Provided |
Not Provided |
54 |
9 |
| 798 |
Procurement of slaughter house hygiene enhancement equipment |
800,000 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 799 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 800 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
9 |
| 801 |
Construction of Sieku primary school ECDE Classroom |
1,699,203 |
Completed |
Not Provided |
Not Provided |
50 |
9 |
| 802 |
Renovation of Nanyuki slaughterhouse |
700,000 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 803 |
Renovation and Equipping of the Baraka Dispensary |
1,499,694 |
Completed |
Not Provided |
Not Provided |
49 |
3 |
| 804 |
Investment in climate smart agriculture |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 805 |
supply and delivery of borehole consumables (Sweet waters) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 806 |
Supply and delivery of pipes and fittings for Kalalu Ndemu water project |
1,018,100 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 807 |
Supply and delivery of borehole consumables (Bingwa Pri School) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 808 |
Supply and delivery of borehole consumables (Githuchi Dispensary) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 809 |
Murraming of Old markets/Mutumba market |
1,859,492 |
Completed |
Not Provided |
Not Provided |
53 |
3 |
| 810 |
Rehabilitation of multipurpose Mailisita dam |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 811 |
Grading and gravelling works at Daiga cess to Daiga primary school road |
3,437,370 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 812 |
Grading and gravelling at Runda Estate to ACK Laneto Seventhday advertist to blessed brains |
4,033,552 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 813 |
Grading and gravelling works at mama Karina to AIPCA road |
2,897,912 |
Completed |
Not Provided |
Not Provided |
52 |
0 |
| 814 |
Grading and culvert installation at Mburugutia Mirera road |
3,630,200 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 815 |
Grading and gravelling works Mwireri world vision to MCK Mwireri and Murega road |
2,738,296 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 816 |
Grading and gravelling works at Kwa Ngata Kariuki charity to Kina road |
2,256,339 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 817 |
Grading, gravelling and culvert installation at Kwa father road near jesus imact church |
2,222,125 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 818 |
Grading and gravelling works at Gitugi road |
2,417,092 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 819 |
Grading, gravelling and culvert installation at PEFA to Imani Jonior and Stadium area |
3,826,550 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 820 |
Installation of milk value addition plant for Umande Cooparative |
997,600 |
Completed |
Not Provided |
Not Provided |
53 |
0 |
| 821 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
5 |
| 822 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
4 |
| 823 |
Equipping of Medical Equipment at Maili Nane Dispensary |
2,983,000 |
Completed |
Not Provided |
Not Provided |
49 |
5 |
| 824 |
Renovations and Equipping of the Baraka Dispensary |
1,499,694 |
Completed |
Not Provided |
Not Provided |
49 |
3 |
| 825 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
0 |
| 826 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
3 |
| 827 |
Grading, gravelling and culvert installation works at P.C.E.A Mirera road |
3,155,988 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 828 |
Grading, gravelling and culvert installation works at Ruai road |
3,253,104 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 829 |
Grading, gravelling and culvert installation at Njogu ini road makanisa to tracer post |
3,302,520 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 830 |
Grading, gravelling and culvert installation at boni road in Thingithu ward |
1,735,737 |
Completed |
Not Provided |
Not Provided |
52 |
3 |
| 831 |
Grading and gravelling works at Tetu primary to Tetu secondary |
1,340,078 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 832 |
Grading and gravelling works at Maili sita to mbara special school |
3,665,484 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 833 |
Rehabilitation of Mitumba market in Thingithu |
1,981,776 |
Completed |
Not Provided |
Not Provided |
53 |
3 |
| 834 |
Grading, gravelling and culvert installation at Kirimara bethel and Irungu road (0.8km) |
2,682,790 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 835 |
Grading, gravelling and culvert installation at Chania road to mama Kinya |
2,312,286 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 836 |
Flushing of and repair of borehole and pump-Sweet waters borehole |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
3 |
| 837 |
Construction of a 3 door pit latrine |
900,000 |
Completed |
Not Provided |
Not Provided |
48 |
1 |
| 838 |
Grading and gravelling works at AIC to Kwa Munyu in Umande ward |
1,294,560 |
Completed |
Not Provided |
Not Provided |
52 |
5 |
| 839 |
Renovation of Nanyuki Social hall |
1,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 840 |
Renovation works of Nanyuki stadium |
4,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 841 |
Grading, gravelling works at Kalalu market |
994,320 |
Completed |
Not Provided |
Not Provided |
53 |
5 |
| 842 |
Construction of Sweetwaters primary school ECDE classroom |
1,911,587 |
Completed |
Not Provided |
Not Provided |
50 |
3 |
| 843 |
EX WEBB borehole (Supply, delivery, join and lay of pipes) |
998,235 |
Completed |
Not Provided |
Not Provided |
54 |
5 |
| 844 |
Renovations and completion of a Dispensary |
3,577,846 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 845 |
Renovations and completion of Muhonia Dispensary |
4,978,210 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 846 |
Rehabilitation of Kaimenyi water Project |
998,800 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 847 |
Construction of Daiga primary school ECDE classroom |
1,697,671 |
Completed |
Not Provided |
Not Provided |
50 |
21 |
| 848 |
Supply and delivery of borehole consumables (Sirma Karandi) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 849 |
Supply and delivery of borehole consumables (kijabeWater Project) |
1,500,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 850 |
Wamura multipurpose water project. |
5,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 851 |
Drainage works |
0 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 852 |
Grading and gravelling works |
3,229,730 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 853 |
Grading and gravelling works |
1,765,520 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 854 |
Grading and gravelling works at Pangama road |
1,777,178 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 855 |
Grading and gravelling works |
3,507,297 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 856 |
Grading and gravelling works |
3,616,590 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 857 |
Construction of Boda boda sheds at Imenti,Wamula and Matopeni |
1,192,445 |
Completed |
Not Provided |
Not Provided |
53 |
1 |
| 858 |
Renovations and Completion of Dispensary |
3,577,846 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 859 |
Renovations and Completion of Muhonia Dispensary |
4,978,210 |
Completed |
Not Provided |
Not Provided |
49 |
1 |
| 860 |
Procurement and distribution of 715 packets of drought recovery Bean seeds |
173,745 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 861 |
Procurement and distribution of drought recovery fruit trees seedlings -1,330 seedlings |
166,250 |
Completed |
Not Provided |
Not Provided |
47 |
1 |
| 862 |
Grading, gravelling and culvert installation and drainage works at Segera primary road |
4,937,540 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 863 |
Grading, gravelling and culvert installation at plot poa to Makutano road |
3,524,544 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 864 |
Grading, gravelling and culvert installation at marina to gushei road |
2,884,920 |
Completed |
Not Provided |
Not Provided |
52 |
1 |
| 865 |
Supply of water tanks at Wiyumiririe |
450,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 866 |
Supply and delivery of pipes at Kiandege water project |
1,000,000 |
Completed |
Not Provided |
Not Provided |
54 |
1 |
| 867 |
Supply of training equipment for VTC Wiyumiririe |
5,000,000 |
Completed |
Not Provided |
Not Provided |
50 |
1 |
| 868 |
Grading and gravelling at Randos Road |
2,025,766 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 869 |
Grading, gravelling and drainage works at Nanyuki Elimu Acadmy to Likii Bridge |
2,258,462 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 870 |
Grading, gravelling and drainage works at Millimani kwa Mama Lilian Road and surrounds |
1,274,420 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 871 |
Grading and gravelling and culvert installation works at Kingat road to Kwa Mwangi to Jehova witness and Zeth road |
2,709,609 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 872 |
Hire of gravel pit to excavate gravel and supply of crusher run to Rehabilitate roads |
2,920,300 |
Completed |
Not Provided |
Not Provided |
52 |
4 |
| 873 |
Installation of solar panel and water tanks at Ukumbusho Market |
1,513,742 |
Completed |
Not Provided |
Not Provided |
53 |
4 |
| 874 |
Construction of new and repair of existing Boda boda sheds at Majengo and Kabiru |
999,514 |
Completed |
Not Provided |
Not Provided |
53 |
4 |